Page 14
TD 17558
Effective 3/98
Display Module
Cut a ¼ DIN (92mm x 92mm) access cutout in the switchgear door
or other panel where the IQ 200 is to be mounted as shown in figure 3.1. Install the
IQ 200 Display Module as shown in figure 3.1, followin g these steps:
•
Install the supplied gasket when using in NEMA 12 applications.
•
Slide the supplied gasket over the rear of the IQ 200 Display Module until it is
flush with the rear of the outer bezel.
•
Insert the IQ 200 Display Module with gasket installed into the cutout.
•
Slide the 4 supplied locking bars into the 4 slots in the top, bottom, and sides at
the rear of the IQ 200 Display Module
•
Insert and tighten the supplied thumbscrews to secure the IQ 200 Display
Module in place.
Connect the grounding terminal on the rear face of the IQ 200 Display Module to
earth ground
.
Base Module
Select a location for
the IQ 200 Base Module.
Depending on the location, use
the mounting holes in the flange
on the front face of the IQ 200
Base Module, the supplied
L-bracket, or the DIN rail/DIN clip
set to secure the IQ 200 Base
Module in the desired location and
orientation. Typical mounting
options are shown in figure 3.3.
The hole drilling pattern for
mounting the IQ 200 Base Module
to floor, wall, or other surface is
shown in figure 3.4.
Figure 3.3 Typical Mounting Options for
Mounting the IQ 200 Base Module
Connect the IQ 200 Base Module to earth ground using the grounding terminal on
the rear face.
Route a Category 5 cable from the IQ 200 Base Module to the IQ 200 Display
Module.
Do not route the Category 5 cable in the same enclosure or cable tray as
600V system wiring.
Содержание IQ 200
Страница 52: ...TD 17558 Effective 3 98...
Страница 53: ...TD 17558 Effective 3 98...
Страница 54: ...TD 17558 Effective 3 98...
Страница 55: ...TD 17558 Five Parkway Center Pittsburgh PA 15220 Effective 3 98 Stlye 8163A33H01 Printed in U S A...