Installation Information
A-16
EATON
Powerware
®
9390 Integrated Battery Cabinet (Models IBC-S and IBC-L) Installation Manual
S
164201536 Rev D
www.eaton.com/powerquality
DESCRIPTION:
DATE:
DRAWING NO:
SHEET:
REVISION:
B
3 of 3
091504
BATTERY POWER AND INTERFACE
TERMINAL LOCATIONS
GROUNDING STUD
CABINET TO UPS AND
CABINET TO CABINET
TERMINALS (-)
CABINET TO UPS AND
CABINET TO CABINET
TERMINALS (+)
INTERFACE TERMINAL
BLOCK TB1 AND
CONNECTORS J3 AND P3
(SEE DRAWING
164201536-8 FOR DETAILS)
BATTERY BREAKER
MODEL IBC-L
GROUNDING STUD
CABINET GROUNDING
(SEPARATE INSTALLATION)
NOTE
: Use pressure and bus bar terminations, as
necessary, for connecting cables between
the UPS and battery cabinet and between
battery cabinets.
INTER‐CABINET WIRING
ACCESS TO ROUTE WIRES
BETWEEN CABINETS.
INTER‐CABINET WIRING
ACCESS TO ROUTE WIRES
BETWEEN CABINETS.
INTER‐CABINET
WIRING
ACCESS TO
ROUTE WIRES
BETWEEN
CABINETS
INTER‐CABINET
WIRING
ACCESS TO
ROUTE WIRES
BETWEEN
CABINETS.
EMP
Содержание IBC-S
Страница 1: ...Powerware 9390 Integrated Battery Cabinet Models IBC S and IBC L Installation Manual...
Страница 69: ......
Страница 70: ...164201536D 164201536 D...