15
XCHARGEIN DC 22 INSTALLATION MANUAL
MN192004EN September 2021 www.eaton.com
00
Title
Number Description
1
xChargeIn DC 22
2
Floor
3
Plug holder
5.2.2 Mounting on the wall
The unit should be fixed 1000 mm from ground level, for optimal accessibility. Refer to the next figure.
Keep 300 mm free space on left and right sides in order to guarantee adequate air flow. Refer to the next figure.
The power input electrical cable and the internet connection cable are inserted below the charging station.
Please note that the appropriate types of plastic plugs and screws must be selected by a professional
installer, based on the following considerations:
•
the location of installation, and
•
the type of the wall on which the system is to be mounted.
This is to ensure the safest possible mounting of the product.
In case of obstacles (e.g. snow, etc.) take precautions and keep 300 mm free space on left and right sides to
ensure adequate air circulation.
Figure 8. Charging station panel of xChargeIn DC 22 with installation distances (mm)
1
2
RFID
3
3
300
1000
1600
300
1000