
Flexi -3G Installation & Commissioning Manual
Chapter 7. Installation of DC Cables
Document No: - 4493-CM-EN-10989402
Page 67 of 94
Copyright © 2008-2009 Eaton Corporation. All Rights Reserved
7.2.2. Install load cables
1
DC Load MCB Terminal
Screw
2
Live (L-/grey) Load Cable
3
Cable Clamp (Bus bar)
4
Return (M/blue) Load Cable 5
Cut-out Panel for DC Cable
Entry
Fig. 7-2 Connecting DC Load Cables
1.
Remove the appropriate cut-outs from the Cut-out Panel for DC Cable Entry.
Remove all burrs and sharp edges
2.
Install the load cables through the Cut-out Panel for DC Cable Entry at the top of the
cabinet.
3.
Use the slotted cable tie bar on top of the cabinet to support the load cables.
1
2
4
3
5