![Eaton Cutler-Hammer ATC-300 Скачать руководство пользователя страница 41](http://html1.mh-extra.com/html/eaton/cutler-hammer-atc-300/cutler-hammer-atc-300_operation-and-maintenance-manual_3839423041.webp)
IB140042EN
For more information visit: www.eaton.com
Instructional Booklet
Effective: May 2015
Page
41
ATC-300/900 Breaker Based Transfer Switch
Figure 45. Source 1 Control Disconnect in the ON Position.
3.The generator should start and the ATS should trans-
fer to Source 2.
4. After transfer, close the upstream breaker, or close
the Source 1 Control Circuit Fused Disconnect. The
TDEN timer should begin counting, and, when com-
plete, the ATS should transfer to Source 1. The
TDEC should time out and shut the Source 2 power
unit down.
Eaton Care for assistance
877-386-2273 option 2, option 4, and then option 3