![Eaton COOPER POWER SERIES Скачать руководство пользователя страница 35](http://html1.mh-extra.com/html/eaton/cooper-power-series/cooper-power-series_installation-and-operation-instruction-manual_3719793035.webp)
Installation procedure
CBC-8000 capacitor bank control installation and operation instructions
MN916001EN—October 2018
Eaton.com
29
8.
Open the cover of the control.
9.
Press the
MANUAL
button to place the control in
Manual mode. The control should remain in Manual
mode while on site. This prevents the control from
operating on remote commands or local metrics while
personnel are near the capacitor banks.
10. Program the control’s clock with the time and date. This
can be performed from the front panel (FUNC 064) or by
using the ProView NXG software. The date is entered in
MM-DD-YYYY format and the hour is entered in 24-hour
format. Refer to the
CBC-8000 capacitor bank control
ProView NXG application software programming guide
(MN916002EN)
for detailed procedures.
11. If additional maintenance work needs to be performed in
the primary voltage area, such as closing a fuse or
replacing a switch, follow your utility company’s standard
procedures. For example:
a. Press the
TRIP
button on the control to open the
capacitor bank.
b. Verify that the capacitor bank tripped open.
c. Open the cutouts on the capacitor bank to disconnect
the capacitor bank from high voltage power.
d. Wait a minimum of 5 to 10 minutes, or whatever time
is required by your utility training procedures, for the
shunt to bleed off.
e. Perform the required maintenance work.
f.
When the required work is completed, close the
cutouts on the capacitor bank to restore high voltage
power to the capacitor bank.
g. Press the
CLOSE
button on the control to close the
capacitor bank.
12. When the work is completed, place the control in
Remote or Automatic mode by pressing the
REMOTE
or
AUTO
button.
13. Apply a seal to the control and record the serial number
of the control and other necessary information.
Installing the cable security sleeve
The optional cable security sleeve protects the connections
to the control from tampering. The cable security sleeve is
installed on the bottom of the control so that it protects the
DIN connector and other connections to the control.
The optional cable security sleeve kit (CBC8K-CBLSLEEVE)
includes the following parts:
• Cable security sleeve
• Star washers, #8 (4)
• Wing nut, #8-32 (4)
The following tools are required to install the optional
security sleeve:
• Drill
• 7/32 inch bit
Figure 32. Security sleeve dimensions
Figure 33. Cable security sleeve
Содержание COOPER POWER SERIES
Страница 49: ......