Installation
4-12 Eaton 93PM Sidecar Integrated Accessory Cabinet-Bypass (150 kW and 200 kW SIAC-B) Installation and Operation Manual P-164000387—Rev
7
www.eaton.com/powerquality
3.
Connect the MBP interface harness green ten position header to the SIAC-B green terminal block.
4.
Connect the MBP interface harness white two position connector to the UPS MBP interface terminal
block connector (see Figure 4-13).
5.
Refer to the applicable Eaton 93PM UPS Installation and Operation manual, listed in paragraph 1.7, to
complete the mechanical installation of the UPS and SIAC-B. After completing the mechanical installation
return to paragraph 4.7.
Figure 4-8. 93PM 150 kW Three-Wire SIAC-B and 93PM 150 kW Four-Wire SIAC-B Interface Terminal Location
Interface Terminal Block
(See Figure 4-10 for detail.)
Содержание 93PM 150 kW SIAC-B Three-Wire
Страница 2: ......
Страница 19: ...Section 1 Installation ...
Страница 20: ......
Страница 75: ...Section 2 Operation ...
Страница 76: ......
Страница 105: ......
Страница 106: ... P 164000387 7 P 164000387 7 ...