manualshive.com logo in svg
background image

INM 9370-RD Rev 5

7

a)  All the necessary gland holes have been prepared in the enclosure. One has 

a breather fitted and the others are fitted with appropriate blanking plugs. 
Where the blanking plugs are replaced by cable gland, the fitted glands must 
be Ex e certified and have an ingress protection (IP) rating that maintains the 
overall rating of the enclosure.

b)  All cable gland holes must be fitted with either a suitable cable gland or 

blanking plug.

CAUTION

 

It is not permitted to create additional holes in the enclosure as this would violate 
the certification.

3.2  Preparation

a)  Remove any temporary protection or packing materials.
b)  The enclosure can be mounted on any suitable structure using the 

enclosure’s integral mounting brackets.

c)  The fixing bolts must be suitable for the mounting surface and the 

environmental conditions.

d)  Prepare holes in the mounting surface, on the centres shown in Figure 3.1 or 

3.2, to accept suitable screws/bolts for mounting.

e)  It is advisable before mounting, to do any necessary replacement of the 

cable entry blanking plugs with a suitable gland. For further details see 
Section 3.1 f) & g).

3.3  Mounting

WARNING!

To minimise the risk of ignition by electrical apparatus in hazardous 
areas, efficient installation, inspection and maintenance of apparatus 
and systems is essential, and the work should be carried out by suitably 
trained personnel in accordance with the prevailing code of practice.

The certification documents specify “Conditions for safe use” that 
must be adhered to and the copy certificate supplied should be 
studied and understood. Additionally it is recommend that a working 
knowledge of IEC EN 60079 -14 be attained, as this standard provides 
guidance in respect to the installation of electrical equipment in 
hazardous areas.

3.3.1  The SS enclosure

It is suggested that the upper two fixing bolts have washers fitted before 
screwing them into prepared holes to a depth that will allow the enclosure to be 
safely hung on them. The enclosure can then be supported on these top bolts 
while the lower fixings are put in place. Finally, all fixings can be tightened to 
the torque level recommended by their manufacturer.

3.3.2  The GRP enclosure

It is recommended that a washer, not exceeding the 12mm diameter specified in 
Figures 3.1 and 3.2, is placed under the head of each of the bolts used to fix the 
enclosure to its mounting surface.

NOTE!

It is important to recognise that the hole centres for the 

middle

 fixings on the GRP 

enclosure are NOT aligned with the holes for the 

end

 fixings. 

Study Figure 3.2 for full details.

It is suggested that the lower fixings should be put in place first, so that the 
enclosure can be supported by them while the upper fixings are put in place.

Содержание 9372-FB-P Series

Страница 1: ...9372 FB Px xx 5 spur redundant fieldbus barrier November 2016 INM 9370 RD Rev 5 Instruction manual MTL fieldbus networks...

Страница 2: ...RATION OF CONFORMITY A printed version of the Declaration of Conformity has been provided separately within the original shipment of goods However you can find a copy of the latest version at http www...

Страница 3: ...Surge module 9376 SP 13 4 6 Spur connections 13 4 7 Blanking Plugs 14 4 8 Final Checks 15 5 MAINTENANCE 15 5 1 General 15 5 2 Fieldbus Barrier maintenance procedures 15 5 3 Terminator and Trunk Surge...

Страница 4: ...semblies may not be used in explosion hazard area applications if they have been used previously in general electrical installations During operation Make the relevant instructions available at all ti...

Страница 5: ...elected for critical process applications where failure of the Fieldbus Barrier would otherwise result in unacceptable downtime or lost production It is also ideal for use in Fieldbus Safety Instrumen...

Страница 6: ...s 1 2 4 5 and 6 of Module A are shown as active A but spur 3 has failed and effectively gone into standby so module B has automatically taken control of spur 3 A to maintain full service to the affect...

Страница 7: ...ase the trunk wiring must be implemented using suitably protected cable The enclosures provide excellent chemical and moisture resistance and are suitable for use in a wide range of corrosive environm...

Страница 8: ...INM 9370 RD Rev 5 6 Figure 3 1 External dimensions and mounting hole positions for the stainless steel enclosure Figure 3 2 External dimensions and mounting hole positions for the GRP enclosure...

Страница 9: ...maintenance of apparatus and systems is essential and the work should be carried out by suitably trained personnel in accordance with the prevailing code of practice The certification documents speci...

Страница 10: ...ut both are suitable for cables from 0 5mm2 AWG 20 up to 2 5mm2 AWG 14 On completion of installation check all blanking plugs and cable glands are tightened to ensure IP rating of the enclosure is mai...

Страница 11: ...power supply In this case the trunk and spur cable shields are connected to each other at the Fieldbus Barrier and are not connected to ground in the field For this arrangement connect the carrier shi...

Страница 12: ...6 Intrinsically safe spur 4 5 T Host Control System Fieldbus Power Supply 9377 FB R Fieldbus Barrier module 5 6 spur 1 2 3 Fieldbus instruments Non intrinsically safe trunk 9377 FB R Fieldbus Barrier...

Страница 13: ...gram and the grounding stud is accessible on the lower left side The trunk terminal connectors are in the middle of the assembly to receive the trunk wiring Terminals are provided to allow a variety o...

Страница 14: ...his direction to remove Trunk wiring terminals Trunk cable entry area Protective ground stud Enclosure wall Figure 4 4 Trunk Termination Assembly TTA Active Spare Overall shield Trunk in with Active S...

Страница 15: ...emoval details 4 5 Trunk Surge module 9376 SP The 9376 SPTrunk Surge module can be fitted to theTTA to prevent damage to the equipment from voltage and current surges that could occur on the trunk wir...

Страница 16: ...ovide a low impedance path for surge currents 4 Fit the connector removed at Step 1 above into the socket on the FS32 and tighten its two securing screws also to a recommended torque of 0 4 Nm Removal...

Страница 17: ...are not WARNING Read and understand what work is permitted inside the enclosure Failure to comply with these instructions can endanger the lives or health of personnel and risk damage to the plant an...

Страница 18: ...a Fieldbus Barrier module refer to Figure 5 1 Note Before fitting a 9377 FB R Fieldbus Barrier module check the connection pins on its underside to ensure that they have not been bent or damaged in a...

Страница 19: ...solid green and all LEDs on Barrier A should pulse to indicate that Barrier A is now in standby mode and Barrier B has become the active barrier 3 Barrier A can now be removed from the carrier followi...

Страница 20: ...1 2 Removing a module Refer to Figures 5 3 and 5 4 for further information Removal is a two step process that first breaks the electrical connection followed by the physical removal of the module from...

Страница 21: ...ing connector to the carrier and unplug it b Plug the Spur Surge module into the vacant socket on the carrier and tighten the two fixing screws and its grounding screw all to a recommended torque of 0...

Страница 22: ...d diagram 5 1 Pressing the A B button will force all spurs to transfer from module A to module B Pressing the B A button will return the spurs to module A Operating the Fail over buttons will reliably...

Страница 23: ...al Green steady Active spur OK Green flashing1 Active spur open circuit Green pulsed2 Standby spur OK Yellow flashing1 Active spur short circuit current limit Yellow steady Active spur short to shield...

Страница 24: ...ance between the plus or minus connections of any spur and the shield S of the spur cable Undetected short to shield faults jeopardise the reliability of a fieldbus network because a second fault may...

Страница 25: ...asurement is repeated in theTemperature Transducer Block SW version Firmware version of the alarm module FW version Hardware version of the alarm module 7 2 2 DI digital input Function Blocks failure...

Страница 26: ...for the black alarm connector 2 Loosen the two captive securing screws on the alarm module and lift it away from the circuit board complete with its wiring and connectors 7 3 2 To install an alarm mo...

Страница 27: ...ular industries or end users may have specific requirements relating to the safety of their installations and these requirements should also be met For the majority of installations the Directive 1999...

Страница 28: ...roduct cannot be repaired by the user and must be replaced with an equivalent certified product 8 5 Marking Each certified component is marked in compliance with the Directive and CE marked with the N...

Страница 29: ...FB Px YY 9375 FB Px YY excludes Alarm Module 9377 FB R Module B NOTE CABLE A IS SHOWN IN FACTORY DEFAULT GROUNDING OPTION I E SINGLE POINT GROUNDING AT HOST 1 1 2 NC 1S 2S 3S 1 2 NC PE TRUNK SURGE PRO...

Страница 30: ...INM 9370 RD Rev 5 28 This page is left intentionally blank...

Страница 31: ...INM 9370 RD Rev 5 29 This page is left intentionally blank...

Страница 32: ...ozavodskaya Str 33 Building 4 Moscow 107076 Russia Tel 7 495 981 3770 Fax 7 495 981 3771 E mail mtlrussia eaton com SINGAPORE Cooper Crouse Hinds Pte Ltd No 2 Serangoon North Avenue 5 06 01 Fu Yu Buil...

Отзывы: