manualshive.com logo in svg
background image

INM 9370-RD Rev 5

25

ATEX INFORMATION

The Essential Health and Safety Requirements (Annex II) of the EU Directive 2014/34/
EU [the ATEX Directive - safety of apparatus] requires that the installation manual of 
all equipment used in hazardous areas shall contain certain information. This annex 
is included to ensure that this requirement is met. It compliments the information 
presented in this document and does not conflict with that information. It is only 
relevant to those locations where the ATEX directives are applicable.

8.1  General

a)  In common with all other electrical apparatus installed in hazardous areas, 

this apparatus must only be installed, operated and maintained by competent 
personnel. Such personnel shall have undergone training, which included 
instruction on the various types of protection and installation practices, 
the relevant rules and regulations, and on the general principles of area 
classification. Appropriate refresher training shall be given on a regular basis. 
[See clause 4.2 of EN 60079-17].

b)  The apparatus has been designed and manufactured so as to provide protection 

against all the relevant additional hazards referred to in Annex II of the Directive, 
such as those in clause 1.2.7.

c)  This apparatus has been designed to meet the requirements of electrical 

apparatus in accordance with EN 60079-0, EN 60079-1, EN 60079-7, EN 60079-11,  
EN 60079-18 and EN 60079-31.

8.2  Installation

a)  The installation should comply with the appropriate European, national and local 

regulations, which may include reference to the IEC code of practice IEC 60079-
14. In addition particular industries or end users may have specific requirements 
relating to the safety of their installations and these requirements should also be 
met. For the majority of installations the Directive 1999/92/EC [the ATEX Directive 
- safety of installations] is also applicable.

b)  The enclosures are certified: 

      II 2(1)GD Ex d e ib mb [ia Ga] IIC T4 Gb Ex tb IIIC T80°C Db (–40°C ≤ Ta ≤ +70°C) and 
are designed for installation in Zone 1 or Zone 2 hazardous areas.

c)  The apparatus must not be subjected to mechanical and thermal stresses in excess 

of those permitted in the certification documentation, this manual and the product 
specification.

d)  All cables and their glands must be chosen to withstand the temperatures at which 

the apparatus is designed to operate. See product specification for details.

e)  The apparatus must not be installed in a position where it may be attacked by 

aggressive substances.

Read also the Special Conditions for Safe Use (below) for any additional or more 
specific information.

Special Conditions for Safe Use

1.  The equipment shall only be powered from supplies conforming to IEC 61158

2.  When a Trunk Surge Module is fitted, due to the presence of transient 

protection components the power input circuit will not withstand a 500V a.c. 
isolation test to earth without breakdown occurring.

3.  When one or more Spur Surge Modules are fitted, due to the presence of 

transient protection components the spur outputs will not withstand a 500V 
a.c. isolation test to earth without breakdown occurring.

8.3  Inspection and maintenance 

a)  Inspection and maintenance should be carried out in accordance with European, 

national and local regulations which may refer to the IEC standard IEC 60079-
17. In addition specific industries or end users may have specific requirements 
which should also be met.

Содержание 9372-FB-P Series

Страница 1: ...9372 FB Px xx 5 spur redundant fieldbus barrier November 2016 INM 9370 RD Rev 5 Instruction manual MTL fieldbus networks...

Страница 2: ...RATION OF CONFORMITY A printed version of the Declaration of Conformity has been provided separately within the original shipment of goods However you can find a copy of the latest version at http www...

Страница 3: ...Surge module 9376 SP 13 4 6 Spur connections 13 4 7 Blanking Plugs 14 4 8 Final Checks 15 5 MAINTENANCE 15 5 1 General 15 5 2 Fieldbus Barrier maintenance procedures 15 5 3 Terminator and Trunk Surge...

Страница 4: ...semblies may not be used in explosion hazard area applications if they have been used previously in general electrical installations During operation Make the relevant instructions available at all ti...

Страница 5: ...elected for critical process applications where failure of the Fieldbus Barrier would otherwise result in unacceptable downtime or lost production It is also ideal for use in Fieldbus Safety Instrumen...

Страница 6: ...s 1 2 4 5 and 6 of Module A are shown as active A but spur 3 has failed and effectively gone into standby so module B has automatically taken control of spur 3 A to maintain full service to the affect...

Страница 7: ...ase the trunk wiring must be implemented using suitably protected cable The enclosures provide excellent chemical and moisture resistance and are suitable for use in a wide range of corrosive environm...

Страница 8: ...INM 9370 RD Rev 5 6 Figure 3 1 External dimensions and mounting hole positions for the stainless steel enclosure Figure 3 2 External dimensions and mounting hole positions for the GRP enclosure...

Страница 9: ...maintenance of apparatus and systems is essential and the work should be carried out by suitably trained personnel in accordance with the prevailing code of practice The certification documents speci...

Страница 10: ...ut both are suitable for cables from 0 5mm2 AWG 20 up to 2 5mm2 AWG 14 On completion of installation check all blanking plugs and cable glands are tightened to ensure IP rating of the enclosure is mai...

Страница 11: ...power supply In this case the trunk and spur cable shields are connected to each other at the Fieldbus Barrier and are not connected to ground in the field For this arrangement connect the carrier shi...

Страница 12: ...6 Intrinsically safe spur 4 5 T Host Control System Fieldbus Power Supply 9377 FB R Fieldbus Barrier module 5 6 spur 1 2 3 Fieldbus instruments Non intrinsically safe trunk 9377 FB R Fieldbus Barrier...

Страница 13: ...gram and the grounding stud is accessible on the lower left side The trunk terminal connectors are in the middle of the assembly to receive the trunk wiring Terminals are provided to allow a variety o...

Страница 14: ...his direction to remove Trunk wiring terminals Trunk cable entry area Protective ground stud Enclosure wall Figure 4 4 Trunk Termination Assembly TTA Active Spare Overall shield Trunk in with Active S...

Страница 15: ...emoval details 4 5 Trunk Surge module 9376 SP The 9376 SPTrunk Surge module can be fitted to theTTA to prevent damage to the equipment from voltage and current surges that could occur on the trunk wir...

Страница 16: ...ovide a low impedance path for surge currents 4 Fit the connector removed at Step 1 above into the socket on the FS32 and tighten its two securing screws also to a recommended torque of 0 4 Nm Removal...

Страница 17: ...are not WARNING Read and understand what work is permitted inside the enclosure Failure to comply with these instructions can endanger the lives or health of personnel and risk damage to the plant an...

Страница 18: ...a Fieldbus Barrier module refer to Figure 5 1 Note Before fitting a 9377 FB R Fieldbus Barrier module check the connection pins on its underside to ensure that they have not been bent or damaged in a...

Страница 19: ...solid green and all LEDs on Barrier A should pulse to indicate that Barrier A is now in standby mode and Barrier B has become the active barrier 3 Barrier A can now be removed from the carrier followi...

Страница 20: ...1 2 Removing a module Refer to Figures 5 3 and 5 4 for further information Removal is a two step process that first breaks the electrical connection followed by the physical removal of the module from...

Страница 21: ...ing connector to the carrier and unplug it b Plug the Spur Surge module into the vacant socket on the carrier and tighten the two fixing screws and its grounding screw all to a recommended torque of 0...

Страница 22: ...d diagram 5 1 Pressing the A B button will force all spurs to transfer from module A to module B Pressing the B A button will return the spurs to module A Operating the Fail over buttons will reliably...

Страница 23: ...al Green steady Active spur OK Green flashing1 Active spur open circuit Green pulsed2 Standby spur OK Yellow flashing1 Active spur short circuit current limit Yellow steady Active spur short to shield...

Страница 24: ...ance between the plus or minus connections of any spur and the shield S of the spur cable Undetected short to shield faults jeopardise the reliability of a fieldbus network because a second fault may...

Страница 25: ...asurement is repeated in theTemperature Transducer Block SW version Firmware version of the alarm module FW version Hardware version of the alarm module 7 2 2 DI digital input Function Blocks failure...

Страница 26: ...for the black alarm connector 2 Loosen the two captive securing screws on the alarm module and lift it away from the circuit board complete with its wiring and connectors 7 3 2 To install an alarm mo...

Страница 27: ...ular industries or end users may have specific requirements relating to the safety of their installations and these requirements should also be met For the majority of installations the Directive 1999...

Страница 28: ...roduct cannot be repaired by the user and must be replaced with an equivalent certified product 8 5 Marking Each certified component is marked in compliance with the Directive and CE marked with the N...

Страница 29: ...FB Px YY 9375 FB Px YY excludes Alarm Module 9377 FB R Module B NOTE CABLE A IS SHOWN IN FACTORY DEFAULT GROUNDING OPTION I E SINGLE POINT GROUNDING AT HOST 1 1 2 NC 1S 2S 3S 1 2 NC PE TRUNK SURGE PRO...

Страница 30: ...INM 9370 RD Rev 5 28 This page is left intentionally blank...

Страница 31: ...INM 9370 RD Rev 5 29 This page is left intentionally blank...

Страница 32: ...ozavodskaya Str 33 Building 4 Moscow 107076 Russia Tel 7 495 981 3770 Fax 7 495 981 3771 E mail mtlrussia eaton com SINGAPORE Cooper Crouse Hinds Pte Ltd No 2 Serangoon North Avenue 5 06 01 Fu Yu Buil...

Отзывы: