UPS 40-160 kVA, 400 V 50/60 Hz output
User’s and Installation Guide
1023294 Revision C
1
Safety Instructions ............................................................................................................5
1.1 Audience ..........................................................................................................................5
1.2 CE marking .....................................................................................................................5
1.3 User precautions ..............................................................................................................6
1.4 Environment ....................................................................................................................6
1.5 Inquiries ..........................................................................................................................6
2
Introduction ......................................................................................................................7
2.1 System description ...........................................................................................................7
2.2 Feature: Active-Front Technology ...................................................................................8
2.3 Feature: Advanced Battery Management (ABM)™ .........................................................8
2.4 Feature: Hot Sync
®
technology ........................................................................................8
2.5 Basic system configuration ..............................................................................................9
3
UPS installation ..............................................................................................................10
3.1 Planning installation ......................................................................................................10
3.2 Unpacking and visual inspection ..................................................................................11
3.3 Delivery check ...............................................................................................................12
3.4 UPS cabinet installation .................................................................................................13
3.5 Unloading the Battery Cabinet from the Pallet..............................................................13
4
Electrical installation ......................................................................................................15
4.1 Procedure for locating the terminals ............................................................................15
4.2 UPS wiring procedure ....................................................................................................16
4.2.1 Installing battery ferrite rings .................................................................................19
4.2.2 Installing ferrite clip for battery breaker.................................................................19
4.3 Battery cabinets .............................................................................................................19
4.3.1 Integral battery cabinet installation procedure .......................................................21
4.3.2 Integral battery cabinet electrical connections .......................................................23
4.3.3 Separate battery cabinet Installation .......................................................................25
4.3.4 Separate Battery Cabinet Electrical Connections ...................................................26
4.4 Battery racks ..................................................................................................................27
5
UPS communication interface .........................................................................................28
5.1 X-Slot communication ...................................................................................................29
5.1.1 Wiring installation for X-slot connections .............................................................29
5.1.2 LanSafe ....................................................................................................................30
5.2 Input and output connections .......................................................................................30
5.2.1 Wiring procedure ....................................................................................................31
5.2.2 To install TB1 wiring to connections: .....................................................................31
5.2.3 To install TB2 wiring to connections: .....................................................................32
5.3 Remote emergency power off ........................................................................................33
5.3.1 Installation ..............................................................................................................33
6
Control Panel .................................................................................................................35
6.1 Identification of the display areas ..................................................................................35
6.2 Main Menu ....................................................................................................................36
6.2.1 Event Screens ..........................................................................................................36
6.2.2 Meter Screens ..........................................................................................................37
6.2.3 Controls screen .......................................................................................................38
6.2.4 Setup screen ............................................................................................................38
6.2.5 Load Off Screen ......................................................................................................39
6.3 Mimic Screen .................................................................................................................40
6.4 Status Indicators ............................................................................................................40