9
200 A Fused Loadbreak Elbow Connector Replacement Fuse
InstallatIon InstructIons
MN132021EN November 2016
Step 16
Push down and twist elbow housing to align the probe
adapter. The threaded hole in the probe adapter should be
centered with respect to the hole in the elbow housing and
perpendicular to the probe axis. By hand, insert loadbreak
probe into the elbow housing along the center axis of the
interface and thread the probe into the probe adapter. A thin
layer of silicone lubricant applied to the last 1/4
"
(6 mm) of
the probe body (not on the threads) can aid in installation.
After at least three turns or when the probe is seated (5-1/2
turns) onto the probe adapter, use provided installation tool
to properly torque the loadbreak probe. Proper torque is
applied when the tool twists at least 180° (1/2 turn).
ote:
N
If a different installation tool is used it must apply a
torque of 100 to 120 lbf-in (11.0 – 13.5 N-m).
Re-attach drain wire lead to the drain wire eye of the elbow
housing.
Clean and lubricate bushing and elbow housing interfaces
areas with a thin, uniform coating of the silicone provided.
Do not connect two different phases of a multiple-phase
system. Before closing a single-phase loop, make certain
both ends of the loop are the same phase.
Step 17
After the fuse has been replaced, using a clampstick,
install the Fused Loadbreak Elbow Connector back onto the
grounded feedthru device.
Step 18
Using a clampstick, remove the insulated protective cap
from the tap end apparatus bushing. Install the tap end
cable termination onto the tap end bushing using the
appropriate procedure for the tap end cable termination.
Step 19
Using a clampstick, remove the insulated protective cap
from the apparatus bushing and the Fused Loadbreak
Elbow Connector from the feedthru device. Install the
Fused Loadbreak Elbow Connector onto the apparatus
bushing using the standard loadmake operating procedures
described in Step 20.
ote:
N
Before installing the Fused Loadbreak Elbow
Connector back onto the apparatus bushing, the
cause for the fuse operation should be remedied.
Assemble Loadbreak Probe
Clean and
Lubricate Interface
Drain Wires