Installation
4-6
Eaton
®
Power Xpert 9395 Integrated Battery Cabinet (Model 1085 and 1085HR) Installation Manual
164201687—Rev 06
www.eaton.com/powerquality
Figure 4-4. Battery Cabinet Bottom Joining Brackets and Ground Wire
11. Secure the bracket to the hinges with hardware from the field kit.
12. Route the ground wire (from the field kit) from the ground stud in one battery cabinet, under the lower
battery tray and through the cabinet-to-cabinet cable access area in the side of the cabinets, and attach to
the ground stud in the other battery cabinet (see Figure 4-4). Hardware is provided on each ground stud.
13. If installing additional battery cabinets, repeat Steps 4 through 12 to join each additional battery cabinet;
otherwise, proceed to Step 14.
14. If not already installed, mount the hanger brackets to the top appropriate side of the last battery cabinet
using M4 screws (see Figure 4-5).
15. If not already installed, hang the side panel on the hanger brackets and align with the front and rear of the
battery cabinet.
16. If not already secured, secure the side panel at the bottom using M4 hex-head screws previously
removed.
17. Proceed to paragraph 4.3.2.
Ground Wire
Ground Studs
Existing Hinge
Existing Hinge
2
t
e
n
i
b
a
C
y
r
e
t
t
a
B
1
t
e
n
i
b
a
C
y
r
e
t
t
a
B
Front View
Bracket from Kit
Nuts from Kit
Top View