FINALIZE
The measurement is saved automatically through the entire workflow. When you have finished the measurement, you
finalize it. When a measurement has been finalized, it is no longer editable. It is however possible to open a copy and
continue working were the last session was ended. For information regarding Copy/Edit, See "File manager" on
page 12.
Finalize a measurement
Usually, you finalize when you have finished your measurement. See " Report" on page 55.
1. Tap
and
.
2. Enter a new name, or leave the default name.
3. Tap
. The file is finalized and no longer editable. The measurement file is added to the File manager.
A. Tap here to change the default file name.
B. Tap to finalize the measurement.
View a finalized measurement
1. Tap
to open the File Manager.
2. Tap the measurement you want to view.
If you want to create a editable copy of the open measurement, tap
and
to open a copy of it.
A. Measure view and Adjust view are not active.
B. Distances are visible but not editable.
10
DISPLAY UNIT
Содержание XT11
Страница 1: ...User Manual English 05 0835 EN Revision 2 0 User Manual last built 9 12 2017...
Страница 2: ......
Страница 6: ...This page intentionally left blank to ensure new chapters start on right odd number pages...
Страница 32: ...32...
Страница 58: ...A Offset B Angular C Both offset and angular misalignment 58 BELT...
Страница 65: ...A Misaligned sheave B Aligned sheave the laser beam disappears in the slot of the target 65 BELT...
Страница 74: ...Part No 12 0985 Camera removed from XT11 74 TECHNICAL DATA...
Страница 76: ...Part No 12 0968 IR Camera added to XT11 Part No 12 0985 Camera removed from XT11 76 TECHNICAL DATA...