To order parts and supplies: 800.343.9353 >> eastwood.com
5
FIG. 7
FIG. 7
FIG. 8
FIG. 8
FIG. 9
FIG. 9
FIG. 10
FIG. 10
FIG. 11
FIG. 11
FIG. 12
FIG. 12
• Insert the Ram
[P]
with the hose connection end facing upward, through the
center holes of the Yoke Plates
[M]
&
[N]
. Thread the previously removed Lock
Collar onto the threads of the Ram
[P]
(FIG 7)
.
• Slip the Nylon Seal
[R]
over the threaded fitting of the Force Gauge
[Q]
then
install it with the Gauge facing forward
(FIG 8)
.
• Remove the protective plastic cap from the female fitting on the side of the Ram
[P]
and thread the male, Hydraulic Pump hose fitting into it
(FIG 9)
.
• Remove the Outer Locknuts and one washer from the Foot Pedal Pivot Shaft
Ass’y
[U]
and set them aside.
• Insert the longer threaded end of the Foot Pedal Pivot Shaft
[U]
(with the inner
nut and washer in place) into the corresponding hole in the face of the right Main
Frame Side
[A] (FIG 10)
.
• Using the previously removed Locknut and Washer, secure the Pivot Shaft tightly
in place.
• With the Pedal facing upward, slide the sleeved end of the Foot Pedal
[F]
over
the Pivot Shaft and secure with the previously removed Locknut and Washer
(FIG 11)
.
NOTE:
Do Not overtighten and cause binding.
• Set one end of the Linkage Arm
[G]
into the Clevis of the Hydraulic Pump Ass’y
Arm, slip a Linkage Clevis Pin
[W]
through the holes and secure with a Cotter Pin
[X] (FIG 12)
.
• Place the opposite end of the Linkage Arm
[G]
into the clevis tabs of the Foot
Pedal
[F]
, slip a Linkage Clevis Pin
[W]
through the holes and secure with a
Cotter Pin
[X] (FIG 12)
.