Eastsign
R
OLL
SIL
TTER
USER
MANU
AL
5
5. Installation
5.1.
Open wooden crate and loosen all bolts (under machine) which fasten the machine to pallet.
5.2.
Unload the machine to clean, flat and dry concrete open indoor space. There should be enough room for
loading and unloading roll material on the right of the machine.
5.3.
Connect the machine to current voltage. Rated voltage is marked on machine nameplate.
5.4.
Install handle to the machine
5.5.
Install rewinding rod holder to the back of the machine. Put rewinding rod on the holder and length
counter as shown in the following images.