Preparing the PROCESSOR for Installation
1C7836 – February 1996
11
Moving the PROCESSOR off the PALLET
[20] Install the RAMPS onto the PALLET.
[21] Insert the BOLTS into the holes in the RAMP through the PALLET.
Important
Do not use the TOP COVER to move the PROCESSOR.
Warning
The PROCESSOR weighs over 135 kg (300 lb) and is on casters. Personnel injury could occur if adequate
assistance is not taken.
[22] Carefully move the PROCESSOR off the PALLET onto the RAMPS and onto the floor.
[23] Lift the TOP COVER and remove the DRIVE SIDE
PANEL and the NON-DRIVE SIDE PANEL.
[24] Remove the TAPE holding the ELECTRICAL
BOX.
H127_0143BA
H127_0143BCA
BOLT
PALLET
RAMPS
H127_0084AA
H127_0084ACA
ELECTRICAL
BOX
TAPE