Plumbing
5B6331 – 01JUN99
39
Section 5: Plumbing
Developer Recirculation System
Removing the RECIRCULATION PUMP B5
Warning
Dangerous Voltage
[1] De-energize the PROCESSOR.
[2] Lift the TOP COVER.
[3] Remove the DRIVE SIDE PANEL.
[4] Remove the SPLASH COVER.
[5] Remove the 2 SCREWS that hold the
RECIRCULATION PUMP to the PROCESSOR.
[6] Move the RECIRCULATION PUMP for better
access to the HOSES.
[7] Install 4 CLAMPS TL-2170 on the 2 developer
HOSES and on the 2 fixer HOSES to the
RECIRCULATION PUMP.
[8] Loosen the 4 HOSE CLAMPS and remove the
2 developer HOSES and the 2 fixer HOSES from
the RECIRCULATION PUMP.
[9] Disconnect the CONNECTOR P/J12.
[10] Remove the RECIRCULATION PUMP.
[11] Install a new RECIRCULATION PUMP and
assemble the PROCESSOR.
H104_0154CA
H104_0154CCC
CONNECTOR
P/J 12
CLAMP
TL-2170
2 LOCK
2 WASHERS
2 SCREWS
COVER
SPLASH
WASHERS
PUMP
RECIRCULATION
Содержание 3434
Страница 4: ...4 01JUN99 5B6331 ...
Страница 19: ...RACKS and CROSSOVERS 5B6331 01JUN99 19 ...
Страница 76: ...ADJUSTMENTS AND REPLACEMENTS 76 01JUN99 5B6331 ...