Operation 25
Turn “Main Power” switch to the “OFF” position.
Special Notes About the Tunnel Shutdown Sequence
The sealer may be shut down at any time by switching the sealer power switch to the
Off position and allow to cool to ambient room temperature. Shutting down the heat
tunnel requires the following.
When shutting down the tunnel, be sure to first turn the heater switch to Off.
Once the heater switch is switched off, it will take some time (this will vary depending
on heat settings) for the tunnel to cool down completely.
When the tunnel cools down to approximately 150°F or 66°C or cooler, shut off the
tunnel conveyor and blowers.
Bringing the tunnel down this way helps prevent damage to the conveyor and
internal components from excess prolonged exposure to heat inside the tunnel.
Allow the tunnel to cool down completely to ambient room temperature before
performing any servicing to avoid burn hazards.
Содержание VS1620
Страница 1: ...VS1620 L Sealer Heat Tunnel Combo Value Series User Guide...
Страница 2: ......
Страница 4: ......
Страница 36: ...36 Parts List VS1620 L Sealer Tunnel Combo Unit Main Assembly...
Страница 46: ...46 Parts List Heat Tunnel Hood Assembly VSTA0066 VS1620DC...
Страница 48: ...48 Parts List L Sealer And Frame VSSA0259 VS1620E...
Страница 53: ...Parts List 53 L Sealer Takeaway Conveyor VSSA0261 LTS504B P...
Страница 65: ......
Страница 66: ......