Installation and Set Up 15
The pin perforation wheel punches little holes in the shrink wrap to allow air to evacuate
while in the shrink tunnel. Loosen the pin perforation adjustment knobs at each end of
the perforating wheel roller and move the perforation rollers away from the rubber roller.
Position the pin perforation rollers according to the product size. After threading the film
move the perforating wheels back to the operating position (against the rubber roller)
and retighten the pin perforation adjustment knobs.
The product tray position is adjustable. Loosen the product tray adjustment knob and
align the product tray with the center fold edge of the shrink film. Retighten the
adjustment knob.
Film and Product Alignment Diagram
Film Core
Thumb Screw
Locking Knobs
Pinwheel
Perforation
Rollers
Shrink Film
Roller
Product Tray
Adjustment Knob
Pin
Perforation
Adjustment
Knob
Pin
Perforation
Adjustment
Knob
Perforation
Pinwheels
Product Tray
Film Core
Retaining Collar
Film Core
Retaining Collar
Operator
Side
End of
Tray
Содержание VS1620
Страница 1: ...VS1620 L Sealer Heat Tunnel Combo Value Series User Guide...
Страница 2: ......
Страница 4: ......
Страница 36: ...36 Parts List VS1620 L Sealer Tunnel Combo Unit Main Assembly...
Страница 46: ...46 Parts List Heat Tunnel Hood Assembly VSTA0066 VS1620DC...
Страница 48: ...48 Parts List L Sealer And Frame VSSA0259 VS1620E...
Страница 53: ...Parts List 53 L Sealer Takeaway Conveyor VSSA0261 LTS504B P...
Страница 65: ......
Страница 66: ......