20 Operation
Main Power
To begin operation turn, the “Main Switch” to the “ON”
position. The “Main Switch” controls power for both the
tunnel and sealer.
Conveyor and Blower
Press the Conveyor and Blower “ON” (green button) to start the conveyor
and blower in the heat tunnel.
To turn the conveyor and blower off press the red Conveyor and Blower
“OFF” button.
Tunnel Heater
Turn the tunnel Heater Switch to the “ON” position.
Содержание VS1620
Страница 1: ...VS1620 L Sealer Heat Tunnel Combo Value Series User Guide...
Страница 2: ......
Страница 4: ......
Страница 36: ...36 Parts List VS1620 L Sealer Tunnel Combo Unit Main Assembly...
Страница 46: ...46 Parts List Heat Tunnel Hood Assembly VSTA0066 VS1620DC...
Страница 48: ...48 Parts List L Sealer And Frame VSSA0259 VS1620E...
Страница 53: ...Parts List 53 L Sealer Takeaway Conveyor VSSA0261 LTS504B P...
Страница 65: ......
Страница 66: ......