background image

10

Maintenance:

Time, Temperature, Pressures, Sample Quality, and the number of Sample Cycles will all have
an affect on the need for maintenance.

·

Preventative Maintenance

In general, a preventative maintenance program is for the purpose of trying to anticipate possible
maintenance that will be required and to choose when to perform that maintenance prior to the actual
need for the maintenance, thus eliminating most emergency responses for the maintenance, or
possible ending up with out a sample.

·

Reactive Maintenance

This is when maintenance is only performed as a reaction to the cylinder not being capable of
containing a sample properly due to some type of component fatigue.

Each cylinder must be visibly reinspected at least once a year for deterioration of seals,
scratches, dents, and gouges. Components that are deteriorated or damaged must be replaced
by factory specified parts as shown on YZ drawings. Components may be replaced by the
factory or user, observing Tie Rod Nut tightening torque values. Additionally at least once a
year, the end caps, tie rods, and cylinder must be thoroughly cleaned with appropriate solvent
recommended by the manufacturer. Replace rupture disc every year under normal conditions.
A more frequent change out of the rupture disc may be necessary due to corrosion, fatigue,
temperature, or adverse conditions. These factors must be evaluated by the user through
actual service experience. 

However; if the disc is not changed periodically when exposed

to these conditions, premature failure (due to elapsed time or pressure) of the rupture
disc may occur, thereby discharging the process media.

Recommended spare parts:

Part Number

Description

Qty.

D3-0052

3" DuraSite Seal Repair Kit

 1

A3-0084

1800 psi Rupture Disc

 2

9. Cylinder Maintenance:

EASTERN ENERGY SERVICES PTE LTD.

60 Kaki Bukit Place #02-19 Eunos Tech Park Singapore, SG 415979 Singapore
Telephone: +65-6748 6911 Fax: +65-6748 6912
Email: [email protected] Website: 

www.eesgroup.com

Содержание DuraSite 3000

Страница 1: ...EASTERN ENERGY SERVICES PTE LTD 60 Kaki Bukit Place 02 19 Eunos Tech Park Singapore SG 415979 Singapore Telephone 65 6748 6911 Fax 65 6748 6912 Email info eesgroup com Website www eesgroup com...

Страница 2: ...Theory of Operation 7 8 DuraSite Installation Use 8 9 Cylinder Maintenance 10 10 Diagrams DuraSite Sample Vessel 12 Adjustable Relief Valve Optional 13 EASTERN ENERGY SERVICES PTE LTD 60 Kaki Bukit Pl...

Страница 3: ...to your question can not be found within this manual please contact YZ Systems at 1 936 788 5593 When calling please have on hand this manual for potential review Also be prepared to provide the follo...

Страница 4: ...of the DuraSite Sample Vessel are illustrated here EASTERN ENERGY SERVICES PTE LTD 60 Kaki Bukit Place 02 19 Eunos Tech Park Singapore SG 415979 Singapore Telephone 65 6748 6911 Fax 65 6748 6912 Emai...

Страница 5: ...n Magnetic Primary Materials 316 Stainless Steel and Aluminum Carrying Case Optional Size 3000 cc EASTERN ENERGY SERVICES PTE LTD 60 Kaki Bukit Place 02 19 Eunos Tech Park Singapore SG 415979 Singapor...

Страница 6: ...te Sample Vessel permits the user to remove a liquid or gas hydrocarbon sample from a pipeline sampling device or other location This is accomplished without changing the pressure of the product or ex...

Страница 7: ...with the magnetic sensor to determine the level of the sample fluid within the vessel A visual level indication can be observed on the DuraSite vessel by the position of the magnetic level marker on...

Страница 8: ...ater than the product supply pressure reading If not repeat Step 1 above Step 3 Once the vessel is connected to the product supply it is necessary to vent a small amount of product prior to filling th...

Страница 9: ...a small amount of product from the vessel removesunmixed product fromthetee relief device gauge etc The unit can now be connected to a chromatograph and the product analyzed Step 10 After analyzing th...

Страница 10: ...s shown on YZ drawings Components may be replaced by the factory or user observing Tie Rod Nut tightening torque values Additionally at least once a year the end caps tie rods and cylinder must be tho...

Страница 11: ...ks or dents 3 Do not install a rupture disc that has been previously installed and removed from the disc holder as reinstalling may adversely affect the joint sealing capabilities and or performance o...

Страница 12: ...uraSite Sample Vessel EASTERN ENERGY SERVICES PTE LTD 60 Kaki Bukit Place 02 19 Eunos Tech Park Singapore SG 415979 Singapore Telephone 65 6748 6911 Fax 65 6748 6912 Email info eesgroup com Website ww...

Страница 13: ...ction S Standard visual indicator 4 1 4 FNPT 8 1 8 FNPT Relieving Pressure Factory set per customer specification Example Model RV18 8 1450 relief valve 800 1800 psig range 1 8 FNPT discharge connecti...

Отзывы: