~ 39 ~
6.5 Circuit Diagram
NOTE
• N and PE wiring via ON-GRID and BACK-UP ports of the inverter are different based on the
regulation requirements of different regions. Refer to the specific requirements of local
regulations.
• There are built-in relays inside of the inverter’s ON-GRID and BACK-UP AC ports. When the
inverter is in the off-gird mode, the built-in ON-GRID relay is open; while when the inverter is
in grid-tied mode, it is closed.
• When the inverter is powered on, the BACK-UP AC port is charged. Power off the inverter
first if maintenance is required for the loads connected with BACK-UP ports. Otherwise, it
may cause electric shock.
6.5.1 N and PE cables are connected together in the Main Panel for wiring.
For Australia, New Zealand and South Africa, the neutral cable of ON-GRID side and BACK-UP
side must be connected together. Otherwise BACK-UP function will not work.
BACK-
UP
Load
Normal Load
Utility
Grid
RCD
Smart Meter
R
C
D
N-BAR
E-BAR
L
N
PE
L
N
PE
PE
L
N
E-N Link
CT
Main Panel
BAT
PV
BMS
BACK-UP
ON-GRID
Meter
Do not wire in this position
if N and PE cables are
connected together
L
N
PE
or
L
N
PE
PE
Inverter
Battery
PV
String
1
2
3
4
5
6
NO
Description
①
≤63A/230V/400V AC breaker
②
32A/230V/400V AC breaker
③
Depends on loads
④
Depends on household loads and inverter capacity
⑤
⑥
30mA RCD (Comply with local regulation)
Содержание EAHI-6000-SL
Страница 15: ...13 Fig 3 5 2 Nameplate information subject to change without further notice and actual nameplate...
Страница 19: ...17 Requirements for installation tools Type Tools and Descriptions installation safety...
Страница 58: ...56 7 12 Product information View the relevant product information by Menu Product Information...