EAST WEST ENGINEERING  

 

INSTRUCTION MANUAL 

 

Type CKM05, CKM10 & CKM15 

CONCRETE KIBBLES 

 

Table of contents 

 
 

Page 

 
 

1) 

Quality Policy Statement 

 

 

2) 

General Description of Product 

 
 

3)

 

Method of Attachment 

 

 

4) 

Operational and Safety Procedures 

 
 

5)

 

Risk Control Measures – Summary 

 

 

6) 

Parts List 

 

 

7) 

Maintenance 

10 

 

 

8) 

Compliance Plate Information 

10 

 

 

9) 

Certification Information 

11 

 

 

10) 

Terms and Conditions 

12 

 

 

Appendix A 

Attached 

 

ALL EAST WEST CONCRETE KIBBLES CONFORM TO  

AS 1418.1 – 2004, AS/NZS 1554.1:2011, AS 2550.1 – 2011, 

AS 2359.1 – 1995, AS 2359.2 – 2013 & AS 3990 – 1993 

 

 

22 Clearview Place, 

 

Brookvale NSW Australia 2100 

 

Ph: (02) 9938 0644  Fax: (02) 9938 0655 

 

Toll Free: 1800 061 998 

 

Email: [email protected] 

 

 

 
 

Содержание CKM05

Страница 1: ...Control Measures Summary 6 6 Parts List 9 7 Maintenance 10 8 Compliance Plate Information 10 9 Certification Information 11 10 Terms and Conditions 12 Appendix A Attached ALL EAST WEST CONCRETE KIBBLE...

Страница 2: ...of 1500kg and a unit weight of 275kg with a capacity for 0 5 cubic metres of material The type CKM10 Concrete Kibble has a Working Load Limit WLL of 3000kg and a unit weight of 320kg with a capacity f...

Страница 3: ...Concrete Kibble with a Forklift ensure that the fork arms are suited to the attachment and set to a width that ensure stability of the load Fig 3 1 type CK10 shown To ensure the Concrete Kibble stays...

Страница 4: ...r not in safe working condition A Competent Person shall inspect the lifting slings lifting bar Gate and Handle mechanisms Chute and chains daily to ensure that they are in safe working order The Oper...

Страница 5: ...an Industrial Truck East West Engineering Concrete Kibbles shall not be modified in any way which affects the operation or performance except with the prior approval of East West Engineering After any...

Страница 6: ...ning in the safe use of the Concrete Kibble shall be undertaken before usage The Crane Operator must not work the Crane unless they are physically and mentally capable This is in accordance with AS 25...

Страница 7: ...izontal movement permissible M When landing the Kibble avoid developing rope slack N The Operator must know the location of the main isolation switch and Fire fighting equipment 5 2 Risk Control Measu...

Страница 8: ...ade aware of the need to release the concrete gradually from the Kibble to prevent the formwork from being overloaded and risk structural damage I The Kibble Operator MUST be made aware that the sudde...

Страница 9: ...60 Long 8 Pouring Chute Sleeve CKM05 16 CKM05 16 CKM05 16 9 Handle Link CKM05 38 CK05 09 CK05 09 10 Washer Flat M20 M20 M20 11 Roll Pin 6 x 40 Long 6 x 40 Long 6 x 40 Long 12 Metric Bolt G8 8 Washer N...

Страница 10: ...components are considered worn or damaged or if safety charts or labels are damaged or illegible the Kibble should be taken out of service and East West Engineering or an Authorised Person contacted f...

Страница 11: ...vant Australian Standards including those listed below AS NZS 1554 1 2011 Structural Steel Welding Welding of Steel Structures AS 1418 1 2004 Cranes General Requirements AS 2550 1 2011 Cranes Safe Use...

Страница 12: ...WE will at its option either repair or replace nonconforming or defective products for which it is responsible or return to buyer their purchase price The foregoing states buyer s exclusive remedy for...

Отзывы: