background image

30

PIZZA OVEN

[email protected]

eastoak.com

1-833-EAST-OAK (USA)

Содержание PT12BK1

Страница 1: ...1 EASTOAK COM OWNER S MANUAL 12 inch Pellet Pizza Oven Owner s Manual MODEL PT12BK1...

Страница 2: ...living on Claim your 3 year warranty at eastoak com warranty Please scan the QR code to view the installation video Questions Comments Reach out to us for expert support support eastoak com eastoak co...

Страница 3: ...is in operation Always use heat resistant gloves to open the oven door or lift the fuel chamber cover It is essential to have someone present while using the pizza oven In case of an open flame espec...

Страница 4: ...njoy it for many years without worry It is the user s responsibility to always practice safe operation and implement reasonable maintenance standards East Oak assumes no responsibility legal liability...

Страница 5: ...PC I Pellet Burner Shell X 1 PC E Pellet Box X 1 PC D Door Handle X 1 PC G Flat Washer X 1 PC J M5 Screws X 4 PCS K M5 20 Screws X 2 PCS L WHAT S IN THE BOX 1 x Furnace Body 1 x Chimney 1 x Chimney Ca...

Страница 6: ...nace body after the pellet cover is installed with four M5 flat head screws K X 4PCS K E D A 2 Pizza Stone Placement Place the pizza stone into the pizza pan The pizza stone should fit completely insi...

Страница 7: ...chimney fixing seat and rotate counterclockwise to secure it in place B After the pellets are poured into the cassette the pellet shovel can be pulled out directly without rotating the angle 6 7 Pell...

Страница 8: ...dle Pizza Stone Axis Seat Assembly Chimney Top Cap PZ 1200 01 PZ 1200 07 PZ 1200 13 PZ 1200 20 PZ 1200 25 PZ 1200 02 PZ 1200 08 PZ 1200 09 PZ 1200 14 PZ 1200 21 PZ 1200 26 PZ 1200 27 PZ 1200 03 PZ 120...

Страница 9: ...resistant gloves during usage 2 If the fuel burns out mid process with a high flame promptly add 1 2 scoops of fuel Wait 1 2 minutes residual heat will reignite the fuel 3 Following successful ignitio...

Страница 10: ...ition of the fuel chamber Allow 5 10 minutes before opening the door to observe the chamber A bright elongated flame covering over 70 of the fuel confirms successful ignition 4 Wait 5 10 minutes Caref...

Страница 11: ...gnition add 2 3 scoops of fuel and continue the preheating for 10 15 minutes with the door closed No further fuel is needed during this phase as the existing chamber contents sustain a burn time of 15...

Страница 12: ...confirms successful ignition 4 Wait 5 10 minutes Preheating Phase Post successful ignition add 2 3 scoops of fuel and continue the preheating for 10 15 minutes with the door closed No further fuel is...

Страница 13: ...dge of the fuel chamber Required Equipment Torch Lighter Recommendation 1 Ignite within the entire pellet pack Fuel chamber assembly Securely lock the filled fuel chamber and pellet pack casing ensuri...

Страница 14: ...he operation to prevent burns ATTENTION Once you ve completed the above steps check through the front door for visible flames inside the chamber If visible it confirms successful ignition Open the chi...

Страница 15: ...flame spillage and other safety hazards The back of the pellet backpack can be removed compatible with the gas module to meet different cooking needs FEATURES Product net weight 47 2 lbs Product size...

Страница 16: ...29 28 EASTOAK COM PIZZA OVEN OWNER S MANUAL 12 inch Pellet Pizza Oven...

Страница 17: ...30 PIZZA OVEN support eastoak com eastoak com 1 833 EAST OAK USA...

Отзывы: