background image

Customer/Warranty Service: (800) 595-9605 

Page 11 

Mounting Guidelines 

(CZ-500F)

 

CZ

500F

 

New

 

Construction

 

Installation

 

Heater

 

must

 

not

 

be

 

located

 

immediately

 

below

 

a

 

socket

outlet.

 

The

 

heater

 

is

 

to

 

be

 

installed

 

so

 

that

 

switches

 

and

 

other

 

controls

 

cannot

 

be

 

touched

 

by

 

a

 

person

 

in

 

the

 

bath

 

or

 

shower.

  

 

 
 
 
 
 
 
 
 
 
 
 

Use

 

the

 

new

 

construction

 

brackets

 

as

 

shown.

 

Attach

 

the

 

heater

 

unit

 

to

 

the

 

wall,

 

6

 

ft.

 

(1.8

 

m)

  

or

 

higher

 

above

 

the

 

floor

 

to

 

the

 

bottom

 

of

 

the

 

heater

 

unit.

  

The

 

higher

 

the

 

better.

 

The

 

higher

 

location

 

of

 

the

 

heater

 

insures

 

that

 

obstacles

 

in

 

the

 

room

 

such

 

as

 

furniture

 

will

 

not

 

encumber

 

the

 

circulation

 

of

 

the

 

infrared

 

heat

 

waves

 

being

 

generated

 

from

 

the

 

heater.

 

This

 

assures

 

even

 

heat

 

distribution

 

and

 

prevents

 

cold

pockets

 

of

 

air.

 

Use

 

the

 

following

 

mounting

 

brackets

  

for

 

heater

 

installation

 

prior

 

to

 

sheetrock

 

installation.

 

CZ

500F

 

Existing

 

Construction

 

Installation

 

 
 
 
 
 
 
 
 
 
 
 

The

 

heater

 

cutout

 

should

 

have

 

a

 

minimal

 

size

 

of

 

18

 

1

/

2

 

(h)

 

x

 

4

 

7

/

8

 

(w).

 

 

Use

 

the

 

retrofit

 

brackets

 

as

 

shown.

 

Attach

 

the

 

heater

 

unit

 

to

 

the

 

wall,

 

6

 

ft.

   

(1.8

 

m)

 

or

 

higher

 

above

 

the

 

floor

 

to

 

the

 

bottom

 

of

 

the

 

heater

 

unit.

  

The

 

higher

 

the

 

better.

 

The

 

higher

 

location

 

of

 

the

 

heater

 

insures

 

that

 

obstacles

 

in

 

the

 

room

 

such

 

as

 

furniture

 

will

 

not

 

encumber

 

the

 

circulation

 

of

 

the

 

infrared

 

heat

 

waves

 

being

 

generated

 

from

 

the

 

heater.

 

This

 

assures

 

even

 

heat

 

distribution

 

and

 

prevents

 

cold

pockets

 

of

 

air.

 

Page 12 

Mounting Guidelines 

(CZ-500F)

 

©2009 EarthWise Technologies, Inc 

Use

 

the

 

following

 

mounting

 

brackets

 

for

 

heater

 

installation

 

in

 

existing

 

construction.

  

Содержание CZ Infrared CZ-1000F

Страница 1: ...ines User Information Guidelines Operating Instructions Warranty Servicing CZ Infrared by EarthWise Feel the Difference CZ Infrared Owner s Manual Therapeutic infrared heating systems for a green heal...

Страница 2: ...by the Company Warranty Restriction This warranty is invalid if the factory applied serial number has been altered or removed from the product Warranty Claim Procedure To obtain warranty service you...

Страница 3: ...ain product in good working order Limitations ALL WARRANTIES IMPLIED BY LAW INCLUDING THE IMPLIED WARRANTIES OF MERCHANTABILITY AND FITNESS FOR A PARTICULAR PURPOSE ARE EXPRESSLY LIMITED TO THE DURATI...

Страница 4: ...reen technology engineering affordable to purchase and economical to operate exceptionally economical extremely quiet they produce comfortable healthy therapeutic infrared heat They are easy to instal...

Страница 5: ...ven with other electrically generated heating systems As much as 65 savings is achieved if replacing heating oil or other fossil fuel heating systems Quiet Operation CZ Infrared heating systems operat...

Страница 6: ...he designer panel on the wall register can be left white or custom painted to match or contrast the walls Patented Proprietary Technology CZ Infrared heaters contain a proprietary high efficiency cera...

Страница 7: ...with a minimum 3 inches of depth Heat Type Therapeutic far infrared heat Heat Chamber copper lined for maximum ion transfer Heating Elements Two 2 ceramic infrared emitters 500 w 500 w Ceramic Life Ex...

Страница 8: ...to be installed Notes Calculate 4 6 hours of running time per day per heater installed to calculate Btu s and electrical energy cost Also remember that multiple unit installations in larger rooms can...

Страница 9: ...uring the summer months Other than this there are no maintenance requirements involved In order to accomplish this the front plastic panel must be removed by removing the four screws and lifting up to...

Страница 10: ...in the room such as furniture will not encumber the circulation of the infrared heat waves being generated from the heater This assures even heat distribution and prevents cold pockets of air OPTIMAL...

Страница 11: ...es below depict a typical wiring procedure using conventional 12 2 wire on a large heater Thermostat Wiring Use any conventional thermostat or doorbell wire to route the thermostat to the heater Unles...

Страница 12: ...ter This assures even heat distribution and prevents cold pockets of air Use the following mounting brackets for heater installation prior to sheetrock installation CZ 500F Existing Construction Insta...

Отзывы: