TXV–CLP-KIT (07/15)
Page 14
Step 1:
Relieve the nitrogen holding charge on the air handler. Locate the TXV Control box within
the 3-1/2 feet of the suction line stub out on the air handler. If the TXV control box is to be fastened
to the air handler, be sure not to drill into the air handler internal components.
Fasten the TXV
control box above the suction line stub out.
Step 2:
Position the Pressure Equalizer Tee
on the suction tube at least 10 inches downstream
from the 90°ell, as shown in Figure 5. Remove the core from Schrader valve on the Tee.
Figure 5. Positioning the Pressure Equalizer Tee