TXV–CLP-KIT (07/15)
Page 15
Step 3:
The
Thermal Bulb must be positioned and clamped to the
suction tube 6 inches
downstream from the 90° elbow as shown in the example illustrated in Figure 6. The
Thermal
Bulb and suction tube must be horizontal
regardless of the air handler application (vertical or
horizontal).
The Thermal Bulb must be positioned at the 3:00, 4:00, 8:00 or 9:00 positions on the suction tube
as illustrated in Figure 6.
Figure 6. Thermal Bulb Positioning
Step 4:
Clamp the thermal bulb firmly against the
clean suction tube
and parallel to it, as shown in
Figure 7.
Isolate the Thermal Bulb from with a cold wet cloth while Nitrogen brazing the joints on the suction
line. After the suction line has cooled, apply the supplied cork tape insulation around the Thermal
Bulb to completely isolate it from the surrounding air, as shown in Figure 8.