- 20 -
3.2 Basic Machine Operation
Step 1
–
Turn on the power to the machine.
Step 2
–
Using the Auto/Hand switch, select a job mode.
Step 3
–
Place the load to be wrapped onto the turntable.
Step 4
–
Connect the loose end of the stretch film to the bottom of the load (ie: corner of the pallet)
Step 5
–
Press the start button to begin wrapping the load.
Step 6
–
Once the job finishes, split the film between the stretch wrapper and the now wrapped
load and secure any loose ends of film.
Step 7
–
Remove the load from the turntable and place the next load onto the turntable.
Repeat steps 2-7 as required
1
2
3
4
5
6
7
Содержание 1000A
Страница 1: ... 1 Operations Manual Eagle 1000 Series Stretch Wrapper Models A B ...
Страница 2: ... 2 READ ALL INSTRUCTIONS CONTAINED IN THIS MANUAL PRIOR TO MACHINE INSTALLATION ...
Страница 9: ... 9 DO NOT push drag or slide machine Doing so will cause severe damage ...
Страница 10: ... 10 2 1 Machine Structure Components Illustration Fig 2 1 Film Carriage Control Panel Turntable Mast ...
Страница 27: ... 27 5 1 Illustration Base ...
Страница 31: ... 31 5 4 Illustration Mast ...
Страница 33: ... 33 ...
Страница 34: ... 34 5 5 Illustration Pre Stretch Carriage ...
Страница 36: ... 36 36 Swing Shaft short FG 142 1 37 Micro Switch MQS 216 1 5 6 Illustration Non Pre Stretch Carriage ...
Страница 38: ... 38 36 Asperities Belt 40 δ2 3300mm 1 ...
Страница 39: ... 39 6 Electrical Schematics ...
Страница 40: ... 40 6 Electrical Schematics ...
Страница 41: ... 41 6 Electrical Schematics ...
Страница 42: ... 42 6 Electrical Schematics ...
Страница 43: ... 43 7 Control Panel LEDs ...