- 16 -
3.1 Operational Steps & Film Loading
BEFORE LOADING FILM, PRESS THE EMERGENCY
STOP BUTTON AND TURN THE POWER
SWITCH TO THE OFF POSITION
Loading stretch film into pre-stretch carriage
(Eagle 1000B)
Step 1
- Loosen fastening screw "A" and take off
roll holder "B".
(See Fig. 3-1)
Step 2
- Center the film core over the film shaft
and lower onto the lower orientation
plate "C" of the film shelf.
(See Fig. 3-1)
Step 3
- Mount roll holder "B" and re-tighten
fastening screw "A".
(See Fig. 3-1)
Step 4
- Push down handle "E" to open carriage
door. Then press the film through in the
direction of the arrow and close the door
(do not slam). Pass the film behind and
around the first roller and then between
the first and second roller.
(See Fig. 3-3)
Fig. 3-1
Fig. 3-2
Fig. 3-3
A
B
C
Содержание 1000A
Страница 1: ... 1 Operations Manual Eagle 1000 Series Stretch Wrapper Models A B ...
Страница 2: ... 2 READ ALL INSTRUCTIONS CONTAINED IN THIS MANUAL PRIOR TO MACHINE INSTALLATION ...
Страница 9: ... 9 DO NOT push drag or slide machine Doing so will cause severe damage ...
Страница 10: ... 10 2 1 Machine Structure Components Illustration Fig 2 1 Film Carriage Control Panel Turntable Mast ...
Страница 27: ... 27 5 1 Illustration Base ...
Страница 31: ... 31 5 4 Illustration Mast ...
Страница 33: ... 33 ...
Страница 34: ... 34 5 5 Illustration Pre Stretch Carriage ...
Страница 36: ... 36 36 Swing Shaft short FG 142 1 37 Micro Switch MQS 216 1 5 6 Illustration Non Pre Stretch Carriage ...
Страница 38: ... 38 36 Asperities Belt 40 δ2 3300mm 1 ...
Страница 39: ... 39 6 Electrical Schematics ...
Страница 40: ... 40 6 Electrical Schematics ...
Страница 41: ... 41 6 Electrical Schematics ...
Страница 42: ... 42 6 Electrical Schematics ...
Страница 43: ... 43 7 Control Panel LEDs ...