Installation, Operation and Parts Manual
EE-MR35
15
Start
Turn on the power switch
The lift is raised
Push the UP button
Turn on the power switch
The lift is lowered
Push the DOWN button
Start
OPERATION INSTRUCTIONS
5.1 Precautions
5.1.1. Read and digest the complete operation instructions before operating the lift.
5.1.2. Only authorized persons are permitted to operate the lift.
5.1.3. Do not try to raise the vehicle with excessive length or width.
5.1.4. The space above and below the load as well as of the loading carrying devices shall be free of obstructions.
5.1.5. Position supporting pads to pick-up positions recommended by vehicle manufacturers.
5.1.6. Check the vehicle after raising a short distance to ensure that it is corrected and safely positioned.
5.1.7. The load carrying device shall be observed by the operator throughout the motion of the lift.
5.1.8. Avoid excessive rocking of vehicle while on the lift
5.1.9. It is forbidden for people to stand in the field of motion during raising or lowering movement.
5.1.10. Do not climb onto the load or load carrying device when they are raised.
5.2 Descriptions of control box
5.3 Flow chart for operation
Pos.
Name
Function
QS
Power switch
Control main power
HL
Power indicator
Show if electricity is connected
SB1
UP button
Control the rising movement
SB2
DOWN button
Control the lowering movement