Installation, Operation and Parts Manual
EE-C18E
15
Step
6:
Connect
the
synchronization
steel
cable.
1.
Route
and
fix
according
to
the
following
scheme
2.
Before
attempting
to
route
the
cables,
raise
the
lifting
carriage
at
both
sides
to
the
first
latching
position
making
sure
that
the
mechanical
safety
locking
units
in
each
post
are
fully
engaged.
3.
After
fixed
the
cables,
adjust
and
make
the
cables
at
both
sides
be
with
the
same
tightness
which
could
be
judged
by
the
sound
emitted
during
lifting
process.
4.
Grease
the
cable
after
being
fixed.
(It
is
a
must.)
Step
7:
Connect
the
hydraulic
system.
1.Install
hydraulic
power
unit
onto
the
power
side
post.
1.
Hex
nut
M10
2.
Flat
washer
M10
3.
Spring
washer
M10
4.
Anti
‐
virbration
pad
5.
Hex
head
full
swivel
screw
M10*30
1.
Steel
rope
A
2.
Steel
rope
B
Содержание EE-C18E
Страница 6: ...Installation Operation and Parts Manual EE C18E 6 1 4 Warning labels ...
Страница 10: ...Installation Operation and Parts Manual EE C18E 10 3 4 Dimensions ...
Страница 25: ...Installation Operation and Parts Manual EE C18E 25 Annex 2 Electrical schemes and parts list ...
Страница 26: ...Installation Operation and Parts Manual EE C18E 26 ...
Страница 27: ...Installation Operation and Parts Manual EE C18E 27 ...