Installation, Operation and Parts Manual
EE-C18E
22
INSPECTION
AND
MAINTENANCE
Easy
and
low
cost
routine
inspection
and
maintenance
can
ensure
the
lift
work
normally
and
safely.
Follow
the
below
routine
inspection
and
maintenance
schedule
with
reference
to
the
actual
working
condition
and
frequency
of
your
lift.
S/N
Components
Methods
Period
1
Swing
arm
locking
units
Push
the
UP
button
to
raise
the
lifting
arms
and
check
if
four
swing
arms
are
locked
into
position.
Add
grease
in
case
necessary.
Every
day
2
Rubber
contact
pads
Inspect
the
pads
and
clean
off
any
objects
that
may
cause
sliding
or
damage.
Every
day
3
Cylinder
and
oil
hose
connectors
Inspect
to
ensure
no
leakage
before
using
the
lift.
Every
day
4
Control
buttons
Check
if
control
buttons
work
as
"hold
‐
to
‐
run
"
and
check
if
they
work
as
the
function
indicated.
Every
day
5
Mechanical
safety
locking
unit
Check
if
both
mechanical
catches
can
engage
and
disengage
simultaneously
by
pushing
control
buttons.
Every
day
Содержание EE-C18E
Страница 6: ...Installation Operation and Parts Manual EE C18E 6 1 4 Warning labels ...
Страница 10: ...Installation Operation and Parts Manual EE C18E 10 3 4 Dimensions ...
Страница 25: ...Installation Operation and Parts Manual EE C18E 25 Annex 2 Electrical schemes and parts list ...
Страница 26: ...Installation Operation and Parts Manual EE C18E 26 ...
Страница 27: ...Installation Operation and Parts Manual EE C18E 27 ...