Installation, Operation and Parts Manual
EE-612FE
26
Annex 1, Floor Plan
See Annex 1 for foundation plan.
There must be a clearance of at least 1 meter between the lifting platform and fixed elements (e.g. wall) in all lifting positions.
There must also be sufficient space for driving vehicles on and off.
C20/25 concrete base with strength more than 3000psi, Minimum thickness of 200mm.
Surface: Horizontal and even (Gradients max. 0.5 %)
Newly built concrete ground must be older than 20days.
Содержание EE-612FE
Страница 10: ...Installation Operation and Parts Manual EE 612FE 10 4 3 Dimensions...
Страница 27: ...Installation Operation and Parts Manual EE 612FE 27 Annex 2 Electrical schemes and parts list...
Страница 28: ...Installation Operation and Parts Manual EE 612FE 28...
Страница 29: ...Installation Operation and Parts Manual EE 612FE 29...
Страница 33: ...Installation Operation and Parts Manual EE 612FE 33...
Страница 36: ...Installation Operation and Parts Manual EE 612FE 36...
Страница 40: ......