E2S D2xC1 Скачать руководство пользователя страница 5

__________________________________________________________________________________________________________________ 

European Safety Systems Ltd.

   Impress House, Mansell Road, Acton, London W3 7QH           [email protected]              Tel: +44 (0)208 743 8880 

                                                                                                                                                             www.e-2-s.com             Fax: +44 (0)208 740 4200 
Document No. D189-00-001-IS     Issue:  9                        01-06-16               Sheet 5 of 7 

 

 

 

Fig. 7b DC Simplified Block Diagram (positive switching)

 

 
9.3 Unit’s First Stage Tones 

Stage one (S1) operation: Simply connect the supply voltage to 
the + and - supply terminals, (see fig. 8). 

 
9.4 DC Units Second, Third and Fourth Stage Tone 
Selection 

For units set up for –ve switching (default setting): 
 
Stage two (S2) operation: Power +ve and –ve, link a -ve supply 
line to the S2 terminal. 
Stage three (S3) operation: Power +ve and –ve, link a  -ve 
supply line to the S3 terminal. 
Stage four (S4) operation: Power +ve and –ve, link a -ve 
supply line to both the S2 & S3 terminals. 
 
For units set up for +ve switching (refer to 9.1): 
 
Stage two (S2) operation: Power +ve and –ve, link a +ve 
supply line to the S2 terminal. 
Stage three (S3) operation: Power +ve and –ve, link a +ve 
supply line to the S3 terminal. 
Stage four (S4) operation: Power +ve and –ve, link a +ve 
supply line to both the S2 & S3 terminals. 

 

 

Fig. 8 DC Terminals 

 

10)  Earthing 
 

The unit has both internal and external earth terminals, (please 
see fig 3). 
Internal earthing connections should be made to the internal 
earth terminal on the PCBA, (please see fig 8 for DC, fig 5 for 
AC). The earth conductor should be at least equal in size and 
rating to the incoming power conductors. The internal earth 
bonding wire connects the PCBA earth terminal to the internal 
earth terminal in the enclosure back box. 
 
External earth connections should be made to the M5 earth 
stud, using a ring crimp terminal to secure the earth conductor 

to the earth stud. The external earth conductor should be at 
least 4mm

2

  in size. The external earth crimp ring should be 

located between the two M5 plain washers provided and 
securely locked down with the M5 spring washer and M5 nut. 
 

11)  End Of Line Monitoring (DC Units Only) 
 

On D2xS1 DC units, dc reverse line monitoring can be used if 
required. All DC alarm horns have a blocking diode fitted in 
their supply input lines. An end of line monitoring resistor can 
be connected across the +ve and –ve terminals. If an end of 
line resistor is used it must have the following values:- 
 

24V DC Alarm horns 

 
Minimum Resistance 3k9 ohms 

Minimum wattage 0.5W 

Minimum Resistance 1k ohms 

Minimum wattage 2.0W 

 
48V DC Alarm horns 

 
Minimum Resistance 15k ohms 

Minimum wattage 0.5W 

Minimum Resistance 3k9 ohms 

Minimum wattage 2.0W 

 
The resistor must be connected directly across the +ve and –
ve terminals as shown in the following drawing. Whilst keeping 
its leads as short as possible, a spacing of at least 1/16 inch 
(1.58mm) must be provided through air and over surfaces 
between uninsulated live parts.  
 

 

 

 

Fig. 9 End Of Line Resistor 

Stage Polarity 
Control 

(See fig.6) 

End Of Line Resistor 

 

STAGE 4 = S2 + S3 
(Customer 
Supplied)

 

Содержание D2xC1

Страница 1: ...NOWN TO BE FREE OF IGNITIBLE CONCENTRATIONS 3 Ratings and Markings 3 1 ATEX IECEx certification The D2xS1 alarm horn complies with the following standards EN60079 0 2012 IEC60079 0 ed 6 0 2011 06 EN60...

Страница 2: ...cable entry and or blanking devices during installation 3 7 Electrical Ratings Part No Nominal Voltage Nominal Current Voltage Range Max Current D2xS1DC024 24Vdc 313mA 10 30Vdc 313mA 24Vdc D2xS1DC048...

Страница 3: ...ations inspection and maintenance Units must not be opened while an explosive atmosphere is present If opening the unit during maintenance operations a clean environment must be maintained and any dus...

Страница 4: ...ply terminals see fig 5 8 3 AC Units Second Third and Fourth Stage Tone Selection To select the second third and fourth stage tones on the D2xS1 AC alarm horns Stage two S2 operation Power L and N lin...

Страница 5: ...se see fig 8 for DC fig 5 for AC The earth conductor should be at least equal in size and rating to the incoming power conductors The internal earth bonding wire connects the PCBA earth terminal to th...

Страница 6: ...f x3 1s gap ISO 8201 Temporal Pattern 0 1 0 1 0 0 44 1 8 12 1000Hz 0 5s on 0 5s off x3 1s gap ISO 8201 Temporal Pattern 1 1 0 1 0 0 44 1 8 13 422 775Hz 0 85 on 0 5 off x3 1s gap NFPA Temporal Coded 0...

Страница 7: ...44 24 12 49 560 1055Hz 0 18Hz Sweeping 0 0 0 0 1 1 44 24 12 50 560 1055Hz 3 3Hz Sweeping 1 0 0 0 1 1 44 24 12 51 600 1250Hz 0 125Hz Sweeping 0 1 0 0 1 1 44 24 12 52 660 1200Hz 1Hz Sweeping 1 1 0 0 1...

Отзывы: