17-3) Header Pins Settings 

 

 

 

 
J1 Header Pin - Position A 
Factory default position (pins 1 & 2 not linked). 
Places TB1 Current Sense Resistor (CSR) in circuit. 
As used in 4-Wire Configuration. 

 

 

 

 
J1 Header Pin - Position B 
(pins 1 & 2 linked) 
Removes TB1 Current Sense Resistor (CSR) out of circuit. 

Figure 13: J1 Header pin positions 

 Current Sense Resistor (CSR) 

 
 

 

 

 
J2 Header Pin - Position A 
Factory default position (pins 1 & 2 linked). 
Removes power supply terminal Fault Resistor (FR) & 
RLY 1-2 out of circuit. 
As used in 4 -Wire Configuration 

 

 

 

 
J2 Header Pin - Position B 
(pins 2 & 3 linked) 
Places power supply terminal Fault Resistor & RLY 1-2 
in circuit. 
As used in 2 

 Wire Configuration. 

Figure 14: J2 Header pin positions 

 Fault Resistor (FR) 

 
 

17-4) SIL 2 Hard Reset Function 

 
Power down the unit completely for a minimum of 30 seconds. Move the hard reset header pin (Jumper J7) to reset position B 
shown. Then power the unit for a minimum of 5 seconds. Power down the unit for 30 seconds and then move the header pin back to 
Position A. 
 
The unit has now been reset. 
 
If the hard reset process does not correct the latched fault the beacon may require further investigation. Please contact your local 
E2S representative. 
 

 

 

 
J7 Header Pin - Position A 
Factory default position (pins 2 & 3 linked). 
Hard Reset Function disabled 

 Normal Operation. 

 

 

 

 
J7 Header Pin - Position B 
(pins 1 & 2 linked) 
Hard Reset Enabled - Active reset mode. 

Figure 15: J7 Header pin positions 

 Hard Reset Function 

 
 

Содержание D1xB2X05-S

Страница 1: ...IQUE NETTOYER UNIQUEMENT AVEC UN CHIFFON HUMIDE HAUT TENSION RISK DE CHOC ATTENDEZ 5 MINUTES APRES AVOIR DEBRANCHE L ALIMENTATION AVANT D OUVRIR LA BOITIER NE PAS PEINTURER POUR R DUIRE LE RISQUE D IN...

Страница 2: ...ss III Div 1 Ta 55 C to 80 C Installation must be carried out in compliance with the National Electric Code Canadian Electric Code 2 4 NEC Class Zone ratings US The D1xB2X Xenon beacons comply with th...

Страница 3: ...t for a short time Zone 21 Explosive dust air mixture likely to occur in normal operation Zone 22 Explosive dust air mixture not likely to occur in normal operation and if it does it will only exist f...

Страница 4: ...14 Explosive atmospheres Electrical installations design selection and erection EN60079 10 1 IEC60079 10 1 Explosive atmospheres Classification of areas Explosive gas atmospheres EN60079 10 2 IEC6007...

Страница 5: ...in explosive gas atmospheres a minimum ingress protection rating of IP54 must be maintained NPT plugs should be greased before insertion For high ambient temperatures the cable entry temperature or t...

Страница 6: ...h conductor should be at least equal in size and rating to the incoming power conductors External earthing connections should be made to the M5 earth stud using a ring crimp terminal to secure the ear...

Страница 7: ...s MUST be fitted in the order shown above 13 Maintenance Overhaul Repair Maintenance repair and overhaul of the equipment should only be carried out by suitably qualified personnel in accordance with...

Страница 8: ...and Active mode Health status of power supply Beacons correct function and flash pattern The SIL 2 beacon operates as part of a SIL 2 system The beacon will after commissioning remain powered in Stan...

Страница 9: ...equire further investigation please contact your local E2S representative Commissioning System Functional start up of System Normally in reverse polarity mode When Commissioning system the power must...

Страница 10: ...h it is highly recommended that the unit is wired as stated in section 17 1 as a 4 Wire System J1 Header Current Sense Resistor CSR Shown in factory default position A see section 17 3 places TB1 Curr...

Страница 11: ...he circuit Note a cable short circuit will not be detectable in this configuration For one unit only Beacon power supply terminal block Current drawn mA Active Mode 190mA Standby Mode 25mA SIL2 TB1 Cu...

Страница 12: ...multiple SIL 2 alarm horn sounders are to be cabled in series the monitoring connections differ from that of a single beacon For more information see manual D197 00 621 IS available from the E2S webs...

Страница 13: ...tion B pins 2 3 linked Places power supply terminal Fault Resistor RLY 1 2 in circuit As used in 2 Wire Configuration Figure 14 J2 Header pin positions Fault Resistor FR 17 4 SIL 2 Hard Reset Function...

Страница 14: ...ndom Hardware Failures and Architectural constraints route 1H 2 As an unvoted item i e hardware fault tolerance of 0 at SIL 2 The product was assessed against failure modes Failure respond to an input...

Страница 15: ...specified when ordering The values of resistors available are shown in table 5 below Code Resistor Value Default resistor coding is as follows D1xB2X05DC024AS1S1R A AFZ Example of a custom requirement...

Страница 16: ...ATERIAL SHEET SCALE TITLE A3 IF IN DOUBT ASK DO NOT SCALE ALL DIMENSIONS IN MM DRAWING NUMBER A B C D E F G 10 9 G F E 7 8 6 5 D C 1 3 4 2 A B D191 06 621 M ABALOS B ISARD R N POTTS OF NTS 1 1 23 09 2...

Страница 17: ...Gb II 2D Ex tb IIIC T95 C T169 C Db Standards applied EN 60079 0 2018 EN 60079 1 2014 EN 60079 31 2014 IP6X Dust Protection to EN60079 0 EN60079 31 Directive 2014 30 EU Electromagnetic Compatibility...

Страница 18: ...Ex d IIC T6 T3 Gb II 2D Ex tb IIIC T95 C T169 C Db Standards applied EN 60079 0 2018 EN 60079 1 2014 EN 60079 31 2014 IP6X Dust Protection to EN60079 0 EN60079 31 Directive 2014 30 EU Electromagnetic...

Отзывы: