background image

_______________________________________________________________________________________________________________________________ 

European Safety Systems Ltd.

   Impress House, Mansell Road, Acton, London W3 7QH           [email protected]              Tel: +44 (0)208 743 8880 

                                                                                                                                                             www.e2s.com             Fax: +44 (0)208 740 4200 
Document No. D191-00-401-IS           Issue 1          03-06-2019                         Sheet 3 of 6

 

 

 

252.3 [9.93in]

7.00 [0.28in]

45.0°

3/4" NPT SIDE ENTRY
2 OFF POSITIONS

MARKED *

M20x1.5 SIDE ENTRY
2 OFF POSITIONS
MARKED #

3/4" NPT BOTTOM ENTRY
FOR POLE MOUNTING
BEACON

2 OFF FEET SUPPLIED IN STOWED POSITION
SUITABLE FOR POLE OR BRACKET
MOUNTING BEACON
RETAINED BY 2 OFF M5 SCREWS PER FOOT

1

6

6

.0

 [6.5

4i

n]

8

3.0 

[3

.2

7in]

2 OFF FEET SUPPLIED IN STOWED POSITION
SUITABLE FOR POLE OR BRACKET

MOUNTING BEACON

RETAINED BY 2 OFF M5 SCREWS PER FOOT

BASE CONFIGURED WITH
FEET SET OUT FOR SURFACE MOUNTING
BEACON

Ø9.0 [Ø0.36i

n]

4)  Installation 

 
There are no restrictions on unit orientation. 
 
The junction box must only be installed by suitably qualified 
personnel in accordance with the latest issues of the relevant 
standards: 
 
EN60079-14 / IEC60079-14: Explosive atmospheres - 
Electrical installations design, selection and erection 
EN60079-10-1 / IEC60079-10-1: Explosive atmospheres - 
Classification of areas. Explosive gas atmospheres 
EN60079-10-2 / IEC60079-10-2: Explosive atmospheres - 
Classification of areas. Explosive dust atmospheres 
 
The  installation of  the units must also be in accordance  with 
any  local  codes  that  may  apply  and  should  only  be  carried 
out  by  a  competent  electrical  engineer  who  has  the 
necessary training. 
 

4.1 Safe Installation Requirements: 

 
To  maintain  the  ingress  protection  rating  and  mode  of 
protection,  the  cable  entries  must  be  fitted  with  suitably 
certified  cable  entry  and/or  blanking  devices  during 
installation.  If  conduit  is  used  for  installation,  seal  conduit 
within 18 inches from the first enclosure, subsequent conduit 
runs  must  have  a  sealing  fitting  connected  as  close  as 
practical  to  the  wall  of  the  enclosure,  but  in  no  case  more 
than the size of the conduit or 50mm, whichever is the lesser. 
 
If  entries  are  fitted  with  adaptors  they  must  be  suitably 
certified  for  the  application.  Fitting  of  blanking  elements  into 
adaptors is not permitted. 

 

Check that t

he ‘O’ ring seal is in place before replacing the 

explosionproof cover. 
 
Lens guard must be fitted for Class Division installations. 
 

5)  Location and Mounting

 

 

The  location of  the  beacon  should be  made  with  due  regard 
to  the  area  over  which  the  warning signal  must  be  visible.  It 
should  only  be  fixed  to  services  that  can  carry  the  weight  of 
the unit. 
 
The  D1xB2LD2  beacon  can  be  mounted  using  one  of  three 
methods. 
 
1.  The beacon can be surface mounted by removing, 

rotating and reinstalling the stowed mounting lugs. These 
are suitable for 6mm diameter fixings. 
 
a.   Remove 2 x M5 fasteners per 

 mounting lug 
 

b.   Reverse and rotate lug and 

reseat onto enclosure 
 

c. 

Secure lug using the 2 x M5 
Fasteners 

           

 

2.  Alternatively  the  beacon  can  be  conduit  mounted  using 

the ¾”NPT entry on the base of the unit. 
 

3.  Additionally,  the  beacon  can  be  mounted  using  the 

ratchet  adjustable  stainless-steel  wall  bracket  assembly. 
This  is  available  as  an  accessory 

–  part  code:  SP77-

0001. 

 
 
 
 
 
 
 
 
 
 

Fig. 1 Fixing Location for Beacon 

 

6)  Access to the Enclosure

 

 

 

 

 

 

In order to connect the electrical supply cables to the beacon, 
it is necessary to open the explosion proof enclosure. Loosen 
the locking grub screw in the cover and then remove the 
glass dome cover assembly to gain access to the chamber. 
This can be achieved by unscrewing the glass dome cover, 
taking extreme care not to damage the threads when doing 
so.  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Fig. 2 Accessing the Enclosure. 

 

On  completion  of  the  installation  the  flameproof  threads 
should  be  inspected  to  ensure  that  they  are  clean  and  that 
they  have  not  been  damaged  during  installation.  Ensure  the 
O-ring seal is in place and undamaged.  
 
When  fitting  the  flameproof  cover  ensure  the  thread  is 
engaged correctly. Fully tighten the cover all the way, ensure 
no  gap  is  visible between  the  cover and  base  of  the  beacon 
enclosure. 

Glass dome 
cover 

Warning 

– High voltage may be present, 

risk of electric shock. DO NOT open when 
energised, disconnect power before 
opening. 

Warning 

 

Hot surfaces. External surfaces 

and internal components may be hot after 
operation, take care when handling the 
equipment. 

3/4" NPT 
Entry 
 

M20 Entry 

3/4" NPT 
Conduit 
Entry 

Отзывы: