background image

 

 

European Safety Systems Ltd.

   Impress House, Mansell Road, Acton, London W3 7QH

www.e2s.com

 

Tel: +44 (0)208 743 8880

Document No. D210-00-721-IS

 

Issue 5

 

12-09-2022

Sheet 4 of 6

 

8.  Selection of Cable. Cable Glands, Blanking 

Elements & Adapters 

 

When selecting the cable size, consideration must be given to 
the input current that each unit draws (see table above), the 
number  of  sounders  on  the  line  and  the  length  of  the  cable 
runs.  The  cable  size  selected  must  have  the  necessary 
capacity  to  provide  the  input  current  to  all  of  the  sounders 
connected to the line.  

 

For  ambient  temperatures  over  +40ºC  the  cable  entry 
temperature  may  exceed  +70ºC  and  therefore  suitable  heat 
resisting cables and cable glands must be used, with a rated 
service temperature of at least 110ºC 

 

The dual cable gland entries have an M20 x 1.5 entry thread. 
To  maintain  the  ingress  protection  rating  and  mode  of 
protection, the cable entries must be fitted with suitably rated 
ATEX / IECEx or UKEx certified cable glands and/or suitably 
rated ATEX / IECEx or UKEx certified blanking devices during 
installation according to EN / IEC60079-14. 

 

If  a  high  IP  (Ingress  Protection)  rating  is  required  then  a 
suitable sealing washer must be fitted under the cable glands 
or blanking plugs.  

 

For  use  in  explosive  dust  atmospheres,  a  minimum  ingress 
protection rating of IP6X must be maintained. 

 

The  BEx  combined  sounder/beacon  range  can  be  supplied 
with the following types of adapters: 

 

M20 to ½” NPT 
M20 to ¾” NPT 
M20 to M25 
It is important to note that stopping plugs cannot be fitted onto 
adapters, only directly onto the M20 entries. 
 
Any other adapters used must be suitably rated and ATEX / 
IECEx or UKEx certified adapters. 

 

9.  Earthing 

 

Both  AC  and  DC  combined  beacon  /  beacon  units  must  be 
connected to an earth. The units are provided with internal and 
external earth terminals which are both located on the terminal 
chamber section of the unit. 

 

Fig. 3 Internal View of Chamber 

 

 

Fig. 4 Internal View of Cover 

 

When  using  the  internal  earth  terminal  ensure  that  the 
stainless steel M4 flat washer is between the incoming earth 
wire and the enclosure.  

 

Internal earthing connections should be made to the Internal 
Earth terminal in the base of the housing using a ring crimp 
terminal to secure the earth conductor under the earth clamp. 
The earth conductor should be at least equal in size and rating 
to the incoming power conductors. Tighten M4 Earth screw to 
1Nm. 

 

External earthing connections should be made to the M5 earth 
stud, using a ring crimp terminal to secure the earth conductor 
to the earth stud. The external earth conductor should be at 
least 4mm² in size.

 

Tighten the Earth nut to 3Nm. Please firmly 

tighten the external grounding terminal so that the stud does 
not  become  loose  and  lay  the  ground  wire  so  that  it  is  not 
caught by twisting and sagging. 
 

10. Cable Connections 

 

The  combined  beacon  /  beacon  unit  BExCBGL2-L2D  has 
separate  printed  circuit  boards  in  the  chamber  and  cover 
sections.  The  terminals  for  the  sounder  are  on  the  printed 
circuit board in the sounder section and the terminals for the 
beacon are on the printed circuit board in the beacon section 
(see figures 5 and 6). See section 7 of this manual for access 
to the enclosure. See section 11  and 12 for AC and DC wiring 
diagrams respectively.  

 

Wires  having  a  cross  sectional  area  between  0.5  mm²  to 
2.5mm² can be connected to each terminal way. If an input and 
output wire is required the 2-off Live/Neutral or +/- terminals 
can be used. If fitting 2-off wires to one terminal way the sum 
of the 2-off wires must be a maximum cross sectional area of 
2.5mm².  Strip  wires  to  8mm.  Wires  may  also  be  fitted  using 
ferrules.  Terminal  screws  need  to  be  tightened  down  with  a 
tightening torque of 0.45 Nm / 5 Lb-in. When connecting wires 
to the terminals great care should be taken to dress the wires 
so that when the cover is inserted into the chamber the wires 
do not exert excess pressure on the terminal blocks. This is 
particularly  important  when  using  cables  with  large  cross 
sectional areas such as 2.5mm². 

 
 
 
 
 
 
 
 
 
 
 
 

Internal 
Bonding 
Wire 
Terminal 

2-off M20 
Cable 
Entries 

Internal 
Earthing 

External 
Earthing 

Содержание BExCBL2-L2D-P

Страница 1: ...ent taken by the various units Nominal current at nominal voltage Table 1 Electrical Ratings It is important that a suitable power supply is used to run the equipment The power supply selected must have the necessary capacity to provide the input current to all of the units The above table shows the input current taken by the various units and shows the maximum voltage at which they can be operate...

Страница 2: ...ccur in normal operation and if it does it will only exist for a short time Gas Groupings Group IIA Propane Group IIB Ethylene Group IIC Hydrogen Acetylene Temperature Classification for Gas Applications T1 450o C T2 300o C T3 200o C T4 135o C T5 100ºC T6 85ºC up to 55ºC ambient Area Classification Dust Zone 21 Explosive dust air mixture likely to occur in normal operation Zone 22 Explosive dust a...

Страница 3: ...d to ensure that the unit cannot move in service Fig 1 Fixing Location for Combined Beacon Beacon 7 Access to the Flameproof Enclosure To access the Ex d chamber remove the four M6 hexagon socket head screws and withdraw the flameproof cover taking extreme care not to damage the flameproof joints in the process M6 cover screws are Class A4 80 stainless steel and only screws of this category can be...

Страница 4: ...n using the internal earth terminal ensure that the stainless steel M4 flat washer is between the incoming earth wire and the enclosure Internal earthing connections should be made to the Internal Earth terminal in the base of the housing using a ring crimp terminal to secure the earth conductor under the earth clamp The earth conductor should be at least equal in size and rating to the incoming p...

Страница 5: ...mum resistance value of 3k3Ω and a minimum power rating of 0 5 watts or a minimum resistance value of 500Ω and a minimum power rating of 2 watts The resistor must be connected directly across the ve and ve terminals as shown in the following drawing The resistor leads should be kept as short as possible Fig 7 End of Line Resistor Placement 13 Flash Rate Settings The BExB2L2D beacons can produce di...

Страница 6: ... Repair Maintenance repair and overhaul of the equipment should only be carried out by suitably qualified personnel in accordance with the current relevant standards EN60079 19 IEC60079 19 Explosive atmospheres Equipment repair overhaul and reclamation EN 60079 17 IEC60079 17 Explosive atmospheres Electrical installations inspection and maintenance The acoustic horn is made out of ABS plastic ther...

Страница 7: ...5W MIN MINIMUM VALUES R1 Single Stage Configuration Simultaneous Operation Config 1a Line Monitoring Stage 1 only Negative switching Stage 1 Flash Pattern Apply Power to Stage 1 ve Stage 1 ve Stage 2 Flash Pattern Apply Power to Stage 1 ve Stage 1 ve Connect Stage 2 to ve Stage 3 Flash Pattern Apply Power to Stage 1 ve Stage 1 ve Connect Stage 3 to ve 24 03 2022 24 03 2022 24 03 2022 BExBGL2D BExC...

Страница 8: ...NTS 1 1 Single Stage Configuration Simultaneous Operation Config 1a Line Monitoring Stage 1 only Negative switching Stage 1 Flash Pattern Apply Power to Stage 1 ve Stage 1 ve Stage 2 Flash Pattern Apply Power to Stage 1 ve Stage 1 ve Connect Stage 2 to ve Stage 3 Flash Pattern Apply Power to Stage 1 ve Stage 1 ve Connect Stage 3 to ve 24 03 2022 24 03 2022 24 03 2022 BExBGL2D BExCBL2 L2D DC LED LE...

Страница 9: ...uality Assurance Notification ModuleD SIRA 05 ATEX M342 Provisions fulfilledby theequipment II 2G Ex db IIB T6 to T4 Gb II 2D Ex tb IIIC T65 C to T130 CDb IP6X Dust Protectionto EN60079 0 EN60079 31 Standards applied EN 60079 0 2012 A11 2013 EN IEC 60079 0 2018 EN 60079 1 2014 EN 60079 31 2014 IP6X Dust Protectionto EN60079 0 EN60079 31 Directive 2014 30 EU Electromagnetic Compatibility Directive ...

Страница 10: ...er Date andPlace of Issue London 23 12 2020 EU Declaration of Conformity On behalf of European SafetySystems Ltd I declarethat on the date the equipment accompanied by this declaration is placed onthemarket theequipment conforms with alltechnical andregulatory requirements oftheabovelisteddirectives regulations and standards This Declaration is issued under thesole responsibility ofthemanufacturer...

Страница 11: ... Chester CH4 9JN UK Quality Assurance Notification Module D CSAE 22UKQAN0046 Provisions fulfilled by the equipment II 2G Ex db IIB T6 T4 Gb II 2D Ex tb IIIC T65 C T130 Db IP6X Dust Protection to EN60079 0 EN60079 31 Standards applied EN IEC 60079 0 2018 EN 60079 1 2014 EN 60079 31 2014 Directive 2014 30 EU Electromagnetic Compatibility Directive EMC Standards applied EN 61000 6 1 2007 EN 61000 6 2...

Страница 12: ... and Place of Issue London 12 09 2022 UKCA Declaration of Conformity On behalf of European Safety Systems Ltd I declare that on the date the equipment accompanied by this declaration is placed on the market the equipment conforms with all technical and regulatory requirements of the above listed directives regulations and standards This Declaration is issued under the sole responsibility of the ma...

Отзывы: