On completion of the installation the flameproof threaded joint 
should  be  inspected  to  ensure  that  they  are  clean  and  that 
they have not been damaged during installation. 
 
Flameproof threaded joints are not intended to be repaired.  
 
Ensure that the ‘O’ ring seal is in place and undamaged. 
 
When  fitting  the  flameproof  cover  ensure  the  thread  is 
engaged correctly. Fully tighten the cover all the way, ensure 
no gap is visible between the cover and base of the beacon 
enclosure. Tighten the M4 grub screw. 

 

7)  Installation Requirements 

 

7.1.  Installation Standards Compliance 

 

 

Attention: Disconnect from power 
source before installation or service 
to prevent electric shock. 

 

The  beacons  must  only  be  installed  by  suitably  qualified 
personnel in accordance with the latest issues of the relevant 
standards. 
 

ATEX / IECEx & UKEx installation standards 
 
EN60079-14  /  IEC60079-14:  Explosive  atmospheres  - 
Electrical installations design, selection and erection. 
 
EN60079-10-1 / IEC60079-10-1: 

Explosive 

atmospheres  -  Classification  of  areas.  Explosive  gas 
atmospheres. 
 
EN60079-10-2 / IEC60079-10-2: 

Explosive 

atmospheres  -  Classification  of  areas.  Explosive  dust 
atmospheres. 
 
The installation of the units must also be in accordance 
with any local codes that may apply and should only be 
carried out by a competent electrical engineer who has 
the necessary training. 
 
NEC / CEC Installation Standards 

 

Cautions 

 

Attention:  Installation  must  be  carried  out  by  an
electrician  in  compliance  with  the  National  Electrical
Code, NFPA 70 or CSA 22.1 Canadian Electrical Code, 
Part  I,  Safety  Standard  for  Electrical  Installations,
Section  32.  /  L'installation  doit  exclusivement  être
réalisée  par  du  personnel  qualifié,  conformément  au
code national d'électricité américain, NFPA 70 ou CSA
22.1  Code  canadien  de  l'électricité,  première  partie,
norme de sécurité relative aux installations électriques,
Section 32. 

 

Attention:  Disconnect  from  power  source  before
installation  or  service  to  prevent  electric  shock  /
Débranchez-le  de  la  source  d'alimentation  avant
l'installation  ou  l'entretien  pour  éviter  tout  choc
électrique. 
 
The installation of the units must also be in accordance 
with any local codes that may apply and should only be 
carried out by a competent electrical engineer who has 
the necessary training. 

 
 
 
 

7.2. Cable Selection and Connections 

 
When  selecting  the  cable  size,  consideration  must  be  given 
to  the  input  current  that  each  unit  draws  (see  table  1),  the 
number  of  beacons  on  the  line  and  the  length  of  the  cable 
runs.  The  cable  size  selected  must  have  the  necessary 
capacity  to  provide  the  input  current  to  all  of  the  beacons 
connected to the line. 

 

Electrical connections are to be made into the terminal blocks 
on  the  PCBA,  using  solid  wire  0.5-4mm2  /  AWG  20-12  or 
stranded  wire,  sizes  0.5-2.5mm2  /  AWG  24-14.  Wire 
insulation  needs  to  be  stripped  8mm.  Wires  may  be  fitted 
securely with crimped ferrules. 
 

 

Figure 4: Wire Preparation.

 

 
Terminal screws need to be tightened down with a tightening 
torque  of  0.45  Nm  /  5  Lb-in.  A  6-way  terminal  blocks  is 
provided on the AC Beacon: 2-off Live, 2-off Neutral terminals 
and 2-off Earth terminals in total. A 6-way terminal blocks is 
provided on the DC Beacon: 2-off +ve, 2-off -ve terminals, 1-
off S2 (Stage 2) and 1-off S3 (Stage 3).  

 

Figure 5: GNExB2 Entries and Terminal Blocks.

 

 
When connecting wires to the terminals great care should be 
taken  to  dress  the  wires  so  that  when  the  cover  is  inserted 
into the chamber the wires do not exert excess pressure on 
the terminal blocks. This is particularly important when using 
cables with large cross-sectional areas such as 2.5mm². 
 

Earthing 

 
Please note that for AC supply voltage product versions the 
Earth terminal on the PCBA does not provide an earth 
connection to the product enclosure. The enclosure must be 
independently earthed using either the external or internal 
earth fixing point, (see fig 5 and notes below). 
 
Internal earthing connections should be made to the Internal 
Earth terminal in the base of the housing using a ring crimp 
terminal to secure the earth conductor under the earth clamp. 
The  earth  conductor  should  be  at  least  equal  in  size  and 
rating to the incoming power conductors. 
 

Содержание GNExB2LD2 Series

Страница 1: ...ermissible Nominal current at nominal voltage and 1Hz flash rate Max rated current at worst case supply voltage and flash rate Table 1 Electrical Ratings Ensure the system power supply is capable of providing the maximum current required for all beacons Review associated cable size length and quantity of beacons on each circuit 2 Warnings POTENTIAL ELECTROSTATIC CHARGING HAZARD CLEAN ONLY WITH A D...

Страница 2: ...gs Canada Codes Standards CAN CSA C22 2 No 60079 0 Ed 4 02 2019 Explosive Atmospheres Part 0 Equipment General Requirements CAN CSA C22 2 No 60079 1 Ed 3 2016 Electrical Apparatus for Explosive Gas Atmospheres Part 1 Flameproof Enclosures d Ratings GNExB2 LD2DC024 LD2AC115 LD2AC230 Ex db IIC T5 Gb Ta 50 C to 70 C Ex db IIC T6 Gb Ta 50 C to 65 C Installation must be carried out in compliance with t...

Страница 3: ...xternal conditions that might cause a build up of electrostatic charges on non conducting surfaces The stainless steel beacon guard is not earthed and may generate an ignition capable level of electrostatic charges It has a capacitance of 10pF according to EN IEC60079 0 clause 7 5 6 Product Mounting and Access 6 1 Location and Mounting The location of the beacons should be made with due regard to ...

Страница 4: ...rom power source before installation or service to prevent electric shock Débranchez le de la source d alimentation avant l installation ou l entretien pour éviter tout choc électrique The installation of the units must also be in accordance with any local codes that may apply and should only be carried out by a competent electrical engineer who has the necessary training 7 2 Cable Selection and C...

Страница 5: ... enclosure but in no case more than the size of the conduit or 50mm whichever is the lesser When only one cable entry is used the other entries must be closed with suitably rated and ATEX IECEx UKEx certified blanking plugs NEC CEC Requirements Only The cable entries have an M20 x 1 5 6H entry thread If the installation is made using cable glands only suitably rated and certified cable glands must...

Страница 6: ...hronised check that the DIP switch is set to1 Hz see Figure 6 9 End of Line Monitoring DC Units All DC units have a blocking diode fitted in their supply input lines An end of line monitoring diode or an end of line monitoring resistor can be connected across the ve and ve terminals in the flameproof chamber If an end of line resistor is used it must have a minimum resistance value of 3k3 ohms and...

Страница 7: ...rd Clean only with a damp cloth 12 SIL 2 Reliability Data Reliability and Functional safety IEC EN61508 which has been assessed and is considered suitable for use in low demand safety function 1 Random Hardware Failures and Architectural constraints route 2H 2 As an unvoted item i e hardware fault tolerance of 0 at SIL 2 The product was assessed against failure modes Failure respond to an input by...

Страница 8: ... DATE ISSUE DATE APPROVED CHECKED DATE DATE DRAWN WEIGHT Kg SURFACE FINISH MATERIAL ALTERNATIVE MATERIAL SHEET SCALE TITLE A3 IF IN DOUBT ASK DO NOT SCALE ALL DIMENSIONS IN MM DRAWING NUMBER A B C D E F G 10 9 G F E 7 8 6 5 D C 1 3 4 2 A B D156 06 401 R N POTTS OF GNExB2 LD2 BEACON NTS 1 1 A FORMAT UPDATE MA 03 12 2021 B INTRODUCTION J S 14 11 19 GNExB2 LD2 R N POTTS J SPILLER 14 11 19 WIRING DIAG...

Страница 9: ... B V Utrechtseweg 310 6812 AR Arnhem Netherlands Quality Assurance Notification Module D SIRA 05 ATEX M342 Provisions fulfilled by the equipment II 2G Ex db IIC T4 T6 Gb II 2D Ex tb IIIC T80 C T138 C Db IP6X Dust Protection to EN60079 0 EN60079 31 Standards applied EN IEC 60079 0 2018 EN 60079 1 2014 EN 60079 31 2014 Directive 2014 30 EU Electromagnetic Compatibility Directive EMC Standards applie...

Страница 10: ...r Date and Place of Issue London 03 12 2021 EU Declaration of Conformity On behalf of European Safety Systems Ltd I declare that on the date the equipment accompanied by this declaration is placed on the market the equipment conforms with all technical and regulatory requirements of the above listed directives regulations and standards This Declaration is issued under the sole responsibility of th...

Страница 11: ...ke Lane Eccleston Chester CH4 9JN UK Quality Assurance Notification Module D CSAE 22UKQAN0046 Provisions fulfilled by the equipment II 2G Ex db IIC T4 T6 Gb II 2D Ex tb IIIC T80 C T138 C Db IP6X Dust Protection to EN60079 0 EN60079 31 Standards applied EN IEC 60079 0 2018 EN 60079 1 2014 EN 60079 31 2014 Directive 2014 30 EU Electromagnetic Compatibility Directive EMC Standards applied EN 61000 6 ...

Страница 12: ...er Date and Place of Issue London 24 02 2022 UKCA Declaration of Conformity On behalf of European Safety Systems Ltd I declare that on the date the equipment accompanied by this declaration is placed on the market the equipment conforms with all technical and regulatory requirements of the above listed directives regulations and standards This Declaration is issued under the sole responsibility of...

Отзывы: