background image

 

 

 

 

E2S Telephone: +44 (0)20 8743 8880 Fax: +44 (0)20 8740 4200 Email: [email protected] 

www.e2s.com 

DC-098_Issue_A (GNExB, GNExJ UKCA).docx - Page 2 of 2 - 

QAF_252_Issue_5

 

 

 

 

Martin Streetz 

Document No.: 

DC-098_Issue_A 

Quality Assurance Manager 

Date and Place of Issue:  London, 24/02/2022 

UKCA Declaration of Conformity 

 

On behalf of European Safety Systems Ltd., I declare that, on the date the equipment accompanied by this declaration is placed on the market, the equipment 

conforms with all technical and regulatory requirements of the above listed directives, regulations and  standards. 

 

This Declaration is issued under the sole responsibility of the manufacturer. 

Содержание GNExB2LD2 Series

Страница 1: ...ermissible Nominal current at nominal voltage and 1Hz flash rate Max rated current at worst case supply voltage and flash rate Table 1 Electrical Ratings Ensure the system power supply is capable of providing the maximum current required for all beacons Review associated cable size length and quantity of beacons on each circuit 2 Warnings POTENTIAL ELECTROSTATIC CHARGING HAZARD CLEAN ONLY WITH A D...

Страница 2: ...gs Canada Codes Standards CAN CSA C22 2 No 60079 0 Ed 4 02 2019 Explosive Atmospheres Part 0 Equipment General Requirements CAN CSA C22 2 No 60079 1 Ed 3 2016 Electrical Apparatus for Explosive Gas Atmospheres Part 1 Flameproof Enclosures d Ratings GNExB2 LD2DC024 LD2AC115 LD2AC230 Ex db IIC T5 Gb Ta 50 C to 70 C Ex db IIC T6 Gb Ta 50 C to 65 C Installation must be carried out in compliance with t...

Страница 3: ...xternal conditions that might cause a build up of electrostatic charges on non conducting surfaces The stainless steel beacon guard is not earthed and may generate an ignition capable level of electrostatic charges It has a capacitance of 10pF according to EN IEC60079 0 clause 7 5 6 Product Mounting and Access 6 1 Location and Mounting The location of the beacons should be made with due regard to ...

Страница 4: ...rom power source before installation or service to prevent electric shock Débranchez le de la source d alimentation avant l installation ou l entretien pour éviter tout choc électrique The installation of the units must also be in accordance with any local codes that may apply and should only be carried out by a competent electrical engineer who has the necessary training 7 2 Cable Selection and C...

Страница 5: ... enclosure but in no case more than the size of the conduit or 50mm whichever is the lesser When only one cable entry is used the other entries must be closed with suitably rated and ATEX IECEx UKEx certified blanking plugs NEC CEC Requirements Only The cable entries have an M20 x 1 5 6H entry thread If the installation is made using cable glands only suitably rated and certified cable glands must...

Страница 6: ...hronised check that the DIP switch is set to1 Hz see Figure 6 9 End of Line Monitoring DC Units All DC units have a blocking diode fitted in their supply input lines An end of line monitoring diode or an end of line monitoring resistor can be connected across the ve and ve terminals in the flameproof chamber If an end of line resistor is used it must have a minimum resistance value of 3k3 ohms and...

Страница 7: ...rd Clean only with a damp cloth 12 SIL 2 Reliability Data Reliability and Functional safety IEC EN61508 which has been assessed and is considered suitable for use in low demand safety function 1 Random Hardware Failures and Architectural constraints route 2H 2 As an unvoted item i e hardware fault tolerance of 0 at SIL 2 The product was assessed against failure modes Failure respond to an input by...

Страница 8: ... DATE ISSUE DATE APPROVED CHECKED DATE DATE DRAWN WEIGHT Kg SURFACE FINISH MATERIAL ALTERNATIVE MATERIAL SHEET SCALE TITLE A3 IF IN DOUBT ASK DO NOT SCALE ALL DIMENSIONS IN MM DRAWING NUMBER A B C D E F G 10 9 G F E 7 8 6 5 D C 1 3 4 2 A B D156 06 401 R N POTTS OF GNExB2 LD2 BEACON NTS 1 1 A FORMAT UPDATE MA 03 12 2021 B INTRODUCTION J S 14 11 19 GNExB2 LD2 R N POTTS J SPILLER 14 11 19 WIRING DIAG...

Страница 9: ... B V Utrechtseweg 310 6812 AR Arnhem Netherlands Quality Assurance Notification Module D SIRA 05 ATEX M342 Provisions fulfilled by the equipment II 2G Ex db IIC T4 T6 Gb II 2D Ex tb IIIC T80 C T138 C Db IP6X Dust Protection to EN60079 0 EN60079 31 Standards applied EN IEC 60079 0 2018 EN 60079 1 2014 EN 60079 31 2014 Directive 2014 30 EU Electromagnetic Compatibility Directive EMC Standards applie...

Страница 10: ...r Date and Place of Issue London 03 12 2021 EU Declaration of Conformity On behalf of European Safety Systems Ltd I declare that on the date the equipment accompanied by this declaration is placed on the market the equipment conforms with all technical and regulatory requirements of the above listed directives regulations and standards This Declaration is issued under the sole responsibility of th...

Страница 11: ...ke Lane Eccleston Chester CH4 9JN UK Quality Assurance Notification Module D CSAE 22UKQAN0046 Provisions fulfilled by the equipment II 2G Ex db IIC T4 T6 Gb II 2D Ex tb IIIC T80 C T138 C Db IP6X Dust Protection to EN60079 0 EN60079 31 Standards applied EN IEC 60079 0 2018 EN 60079 1 2014 EN 60079 31 2014 Directive 2014 30 EU Electromagnetic Compatibility Directive EMC Standards applied EN 61000 6 ...

Страница 12: ...er Date and Place of Issue London 24 02 2022 UKCA Declaration of Conformity On behalf of European Safety Systems Ltd I declare that on the date the equipment accompanied by this declaration is placed on the market the equipment conforms with all technical and regulatory requirements of the above listed directives regulations and standards This Declaration is issued under the sole responsibility of...

Отзывы: