![E-TON Yukon II Скачать руководство пользователя страница 219](http://html1.mh-extra.com/html/e-ton/yukon-ii/yukon-ii_service-manual_3181419219.webp)
ELEC
7 - 31
SIGNALING SYSTEM
4. Wiring
Check the entire signaling system’s wiring.
7. The bizzer fails to sound.
2. Voltage
• Connect the pocket tester (DC 20 V) to the
bizzer connector at the bizzer terminal as
shown.
Positive tester probe
blue/black
Negative tester probe
ground
• Set the main switch to “ON”.
• Measure the voltage (DC 12 V) of blue/brown
at the bizzer terminal.
• Is the voltage within specification?
L/B
B
-
+
The wiring circuit from
the main switch to the
bizzer connector is faulty
and must be repaired.
YES
NO
YES
NO
1.
Reverse switch
•
Check the
reverse switch for continuity.
Refer to
“
CHECKING THE SWITCHES
”.
•
Is the
reverse switch OK?
Replace the
reverse switch.
• Set the shift rod to “R”.