![E-TON Yukon II Скачать руководство пользователя страница 183](http://html1.mh-extra.com/html/e-ton/yukon-ii/yukon-ii_service-manual_3181419183.webp)
CHECKING THE BALL JOINTS
The following procedure applies to both of the
front arm ball joints.
1. Check:
• ball joint
Damage/pitting → Replace the front arm.
Free play → Replace the front arm.
Turns roughly → Replace the front arm.
INSTALLING THE FRONT ARMS
The following procedure applies to both of the
front arms.
1. Install:
• suspension of arm
Front arm
35 Nm (3.5 m•kg, 25.3 ft•lb)
ASSEMBLIES
FRONT ARMS AND FRONT SHOCK ABSORBER
CHAS
6 - 36
1