Proteus 1000 Operation Manual
13
Setup
This section thoroughly describes how to set up your new Proteus 1000 for
use. Setup includes unpacking instructions and how to connect the cables.
Unpacking
Carefully remove Proteus 1000 from the packaging material. Take care to
save the packing materials in case you need to transport the unit. Check to
make sure all components are included and in good condition. If there are
missing or damaged components, contact E-MU Systems immediately for
replacement or repair.
The Proteus 1000 box should include the following components:
•
Proteus 1000 rack unit
•
Power cable
•
Rack mounting ears
•
This operation manual
•
Manuals CD-ROM
Содержание Proteus 1000
Страница 1: ...Operation Manual ...
Страница 28: ...20 E MU Systems Setup Instant Gratification ...
Страница 62: ...54 E MU Systems Master Menu MIDI Parameters ...
Страница 148: ...140 E MU Systems Programming Tutorial Linking Presets ...