17
Installation instructions:
•
Tighten the union nuts finger-tight.
•
Mark the union nuts at the 6 o' clock position.
•
Hold the screw connection body tight and tighten the
union nuts with 1 ¼ turns to the 9 'o clock position.
Assembly with high pressure applications and applications with a high security factor:
•
Tighten the union nuts until the pipe can no longer be turned by hand or can no
longer be moved axially in the fitting.
•
Mark the union nuts at the 6 o' clock position.
•
Hold the screw connection body tight and tighten the union nuts with 1 ¼ turns to
the 9 'o clock position.
Re-mounting:
•
Slide measurement sensor with clamping rings into the fitting as far as it will go.
•
Tighten the nut "fingertight", then tighten by approx. a ¼ turn using a spanner.
3.5.2 Mounting with mounting flange (optional)
The assembly flange must not be used as Zone or Division bushing, i.e. it must only be used
for fastenings and bushings in explosion-hazard areas of the same category.
Horizontal mounting
Vertical mounting
The measurement sensor must be mounted horizontally or vertically (downwards). If possible,
a drip tray should be placed into position before every installation.
1
3mm (0.5")
Содержание EE300E Series
Страница 26: ...34 10 EC Declaration of Conformity...
Страница 27: ...35 11 IECEX CERTIFICATE OF CONFORMITY COC...
Страница 28: ...36...
Страница 29: ...37...
Страница 30: ...38...