PowerDepot H5 series User Manual
11
Table 3-2 Installation steps
Step1
System outage
1.
Ensure that the battery is in a shutdown state
(Disconnect the battery power cable and press the Reset
button to turn it off)
Step 2
Mechanical
installation
1. bracket check
2.Equipment installation
Step3
Electrical
installation
1. Connect the grounding cable
2 Electrical installation
3.Connect inverter
4.Communication interface connection
3.2.1 Floor installation
When the battery system is placed directly on the ground, a fixed support must be used to fix the
top of the battery box on the wall.
1
.
Use the positioning cardboard
(provided in accessory package)
and mark the screw hole positions
on the wall, as shown four holes
in the picture on the left.
2
.
The bottom of the board must be
in horizontal touch with the
ground while marking the holes.
3
.
According to the marked position, use
an electric drill to drill 4 holes with a
diameter of 10mm on the wall for
installing M6 expansion bolts. The
depth of the holes should be greater
than 70mm.
Содержание PowerDepot H5
Страница 1: ...V1 1 PowerDepot H5 User Manual ...