![Dynatup 8250 Скачать руководство пользователя страница 23](http://html.mh-extra.com/html/dynatup/8250/8250_operating-instructions-manual_2549225023.webp)
3-1
Installation
Chapter 3
Installation
Outline
•
Preparing the Site ............................................................................................3-2
•
Uncrating the Machine ....................................................................................3-4
•
Securing the Model 8250 in Place....................................................................3-5
•
Connecting Utilities and Initial Set-up .............................................................3-6
•
Installing Specimen Support Fixtures ..............................................................3-8
•
Installing the Tup ............................................................................................3-9
•
Initial Machine Operation and Checkout........................................................3-10
Содержание 8250
Страница 1: ... M14 13655 EN Operating Instructions Instron Dynatup 8250 Drop Weight Impact Tester ...
Страница 10: ...Preliminary Pages M14 13655 EN x ...
Страница 29: ...Connecting Utilities and Initial Set up 3 7 Installation Figure 3 3 Motor Enclosure ...
Страница 34: ...Initial Machine Operation and Checkout M14 13655 EN 3 12 ...
Страница 49: ...6 1 Operation Chapter 6 Chapter 6 Operation Outline Performing a Test 6 2 ...
Страница 54: ...Performing a Test M14 13655 EN 6 6 ...
Страница 58: ...Scheduled Maintenance M14 13655 EN 7 4 Figure 7 1 Lubrication Points LUBRICATION POINTS ...
Страница 62: ...Troubleshooting M14 13655 EN 7 8 ...
Страница 64: ...Glossary M14 13655 EN A 2 ...