DFE-22-011
Toll Free: 1-800-928-3962
2002-2009 Yamaha Road Star Warrior - 6
17 Plug the pair of connectors from the Fusion with BROWN colored
wires in-line of the stock Crank Position Sensor connectors (Fig. K).
18 Reinstall the bike’s ECU back into its original location.
19 Locate the stock ground. Follow the negative battery cable to the
frame. Remove the allen bolt that secures the ground cable to the
frame. Reinstall the allen bolt thru the stock ground cable, then thru
the ground wire ring lug from the Fusion into the frame (Fig. L).
20 Using the supplied Velcro, attach the Fusion to the top of the ECU
(Fig. M).
Use the alcohol swab to clean both surfaces before attaching.
21 Reinstall the cover, fuel tank, and seats.
Optional Inputs:
Speed input
- WHITE/YELLOW wire of WHITE 3 pin plug. Located
under ECU (WHITE/YELLOW - BLUE - BLUE/BLACK)
12v source for DynaTune
- BLUE wire of 6 pin connector for tail light.
Located under the ECU
FIG
.M
FIG
.L
Ground wire
FIG
.K