8.5 Running-in instructions
8.5.1 General
The following maintenance work must be performed when running
in new machines or overhauled engines.
8.5.2 After 25 operating hours
1.
Change the engine oil
Chapter 8.9.2 „Changing engine oil
and oil filter element“ on page 92
.
2.
Check the valve clearance, adjust if necessary
8.9.1 „Checking, adjusting the valve clearance“ on page 90
3.
Check engine and machine for leaks.
4.
Retighten the fastening screws on air filter, exhaust and other
attachment parts.
5.
Retighten the bolted connections on the machine.
6.
Check tension of V-belt, tighten if necessary
„Servicing the V-belt“ on page 87
.
7.
Check tension of toothed belt, tighten if necessary
8.8.3 „Servicing the toothed belt“ on page 87
Maintenance – Running-in instructions
DTR75
81
Содержание DTR75
Страница 2: ...2 ...
Страница 6: ...10 Disposal 117 10 1 Final shut down of machine 118 Table of contents DTR75 6 ...
Страница 7: ...1 Introduction Introduction DTR75 7 ...
Страница 11: ...2 Technical data Technical data DTR75 11 ...
Страница 15: ...3 Concerning your safety Concerning your safety DTR75 15 ...
Страница 43: ...4 Indicators and control elements Indicators and control elements DTR75 43 ...
Страница 48: ...Indicators and control elements Engine DTR75 48 ...
Страница 49: ...5 Checks prior to start up Checks prior to start up DTR75 49 ...
Страница 57: ...6 Operation Operation DTR75 57 ...
Страница 69: ...7 Loading transporting the machine Loading transporting the machine DTR75 69 ...
Страница 74: ...Loading transporting the machine After transport DTR75 74 ...
Страница 75: ...8 Maintenance Maintenance DTR75 75 ...
Страница 107: ...6 Check the oil levels 7 Clean the machine thoroughly Maintenance As required DTR75 107 ...
Страница 108: ...Maintenance As required DTR75 108 ...
Страница 109: ...9 Troubleshooting Troubleshooting DTR75 109 ...
Страница 117: ...10 Disposal Disposal DTR75 117 ...
Страница 119: ......
Страница 120: ......