8.2 Preparations/concluding work
Certain maintenance tasks require preparations and concluding
activities.
This includes e.g. opening and closing maintenance flaps and
maintenance doors as well as securing certain components.
After this work close all maintenance flaps and doors again and
return all components to their operating condition.
8.2.1 Opening the protection hood
1.
Unscrew the fastening screws left and right and fold the pro-
tection hood forward.
B-834-0249
Fig. 66
Maintenance – Preparations/concluding work
DTR75
77
Содержание DTR75
Страница 2: ...2 ...
Страница 6: ...10 Disposal 117 10 1 Final shut down of machine 118 Table of contents DTR75 6 ...
Страница 7: ...1 Introduction Introduction DTR75 7 ...
Страница 11: ...2 Technical data Technical data DTR75 11 ...
Страница 15: ...3 Concerning your safety Concerning your safety DTR75 15 ...
Страница 43: ...4 Indicators and control elements Indicators and control elements DTR75 43 ...
Страница 48: ...Indicators and control elements Engine DTR75 48 ...
Страница 49: ...5 Checks prior to start up Checks prior to start up DTR75 49 ...
Страница 57: ...6 Operation Operation DTR75 57 ...
Страница 69: ...7 Loading transporting the machine Loading transporting the machine DTR75 69 ...
Страница 74: ...Loading transporting the machine After transport DTR75 74 ...
Страница 75: ...8 Maintenance Maintenance DTR75 75 ...
Страница 107: ...6 Check the oil levels 7 Clean the machine thoroughly Maintenance As required DTR75 107 ...
Страница 108: ...Maintenance As required DTR75 108 ...
Страница 109: ...9 Troubleshooting Troubleshooting DTR75 109 ...
Страница 117: ...10 Disposal Disposal DTR75 117 ...
Страница 119: ......
Страница 120: ......