background image

D1555_D1558 installation manual 29042022 V5 

 

 

 

 

 

 

Dimensions for both D1555 & D1558 

 

 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Installation 

Mount the metal enclosure onto the wall. 
Connect the Live, Earth and Neutral terminals to an un-switched fused spur. 
Connect the On/Off switching control to the control unit.  Select the mode of operation using the jumper 
(see below). 
Connect the Normally Closed relay output to the monitoring equipment used to report and signal 
equipment faults. 
Connect the 12V power output to the system. 
Switch on the AC supply and confirm that the AC OK LED is lit 
 

External Power Supply (AC Supply) 

The power supply has a three-way terminal block for Live, Earth and Neutral connections.  When supplied 
boxed, earth is connected to the metal enclosure and the lid earthed with a flying push-fit lead. 

 
 
 
 

Scale

1:1.5mm

Description: D1558

General Tolerances:

        +-0.5mm

Projection:

Date: 26/03/2022

Material: PCB

Version

 

No 2

:4

1

4

0

.2

108

96.1

1

2

7

.9

5

.2

6.8

7

.1

5.1

4

2

.1

3

6

.6

Содержание D1555

Страница 1: ...r D1555 D1558 12V Switched Mode Power Supplies Ideal for Access Control Systems Dycon Power Solutions Ltd Tel 44 0 1443 471 900 Unit A Cwm Cynon Business Park Mountain Ash CF45 4ER UK www dyconpower com sales dyconpower com ...

Страница 2: ...tery connection monitoring Battery deep discharge protection Inductive and capacitive load switching surge protection and snubbing Electronic overload protection with automatic reset Highly efficient power conversion better than 84 at full load Low voltage drop when in standby mode The ON OFF switched output The ON OFF switched output is designed for highly inductive loads such as access control d...

Страница 3: ...o the monitoring equipment used to report and signal equipment faults Connect the 12V power output to the system Switch on the AC supply and confirm that the AC OK LED is lit External Power Supply AC Supply The power supply has a three way terminal block for Live Earth and Neutral connections When supplied boxed earth is connected to the metal enclosure and the lid earthed with a flying push fit l...

Страница 4: ...d to a maximum of 18 seconds after a long duration short to prevent excessive switch power dissipation The PSU power rail is continuously monitored for over voltage and in the event of a high voltage condition the output will be automatically switched off and a fault signalled LED Indications The status of the PSU is displayed by three LEDs see below for their meaning KEY LED on LED off LED blinki...

Страница 5: ...ree contacts and open collector outputs If the ON OFF input is left unconnected when the jumper is not fitted the power supply will be switched on Switching examples are shown below ON OFF 0V ON OFF 0V Open Collector Normally closed contacts Jumper not fitted PSU output on when collector is low transistor on Jumper fitted PSU output on when contacts are open Battery Management The battery is conti...

Страница 6: ...size A housing 1 x 7 8Ah 235 x 170 x 85 1 35 D1555 B D1558 B Steel medium size B housing 2 x 7 8Ah 260 x 320 x 90 2 15 D1555 XB D1558 B Steel Clam shell lid XB housing 2 x 7 8Ah or 2 x 17Ah 295 x 425 x 90 2 45 D1555 XLB D1558 XLB Steel standard size XLB housing 2 x 7 8Ah or 2 x 17Ah 295 x 425 x 90 2 45 D1555 XLBD D1558 XLBD Steel extra deep XLBD housing Up to 4 x 17Ah 295 x 490 x 165 4 65 D1555 C ...

Отзывы: