background image

6

R.O. Membrane:

The third and main stage of the filtration is R.O. membrane. It is “semi-permeable”, which 
means that it allows water to pass through but prevents dissolved particles from passing 
through. It splits the feed water into two streams: clean water goes to the post-filter and then 
onto the tank and faucet. Waste water with rejected particles goes down the drain.

Post-Filter:

Last stage of filtration is an activated carbon post-filter and/or remineralization for fine con-
ditioning and keeping the extra freshness of your water.

Specification
Operating Requirements:

Minimum supply water pressure: 7.25 psi (0.05 MPa)

Maximum supply water pressure: 80 psi (0.55 MPa) 

Minimum water temperature: 41 

o

F (5 

o

C)

Optimal water temperature: 59–77 

o

F (15–25 

o

C)

Maximum water temperature: 95 

o

F (35 

o

C) / up to 105 

o

F (40.5 

o

C) short-term

Ambient air temperature: 41–105 

o

F (5–40.5 

o

C)

Water source: tap water supply, chlorinated or non-chlorinated, bacteriologically safe

Supply water pH range: 4.0-11.0

Supply water turbidity: < 1 NTU

Supply  water  components:  Hardness  (CaCO

3

)  <180  mg/L  (<10.5  gpg),  Iron  <0.1  mg/L, 

Manganese <0.05 mg/L, Hydrogen Sulfide 0.00 mg/L

Maximum supply water TDS: 1000 ppm

Indoor use only.

Electrical input: AC 100-240V 50/60 Hz

Maximum length of the line between the pump unit and the membrane (“split installa-
tion”): 50 ft (15 m) (purchase of extra tubing may be required)

Tubing: ¼”

Performance:

Performance of the appliance such as filtered water delivery rate, rejection rate, etc. is highly 
dependent on local conditions (inlet water pressure, temperature, TDS and degree of contam-
ination, tank air pressure, etc.) and R.O. system use pattern. Actual performance may vary.

Filtered water production rating: 75 gpd (270 lpd) maximum

Filtered water delivery rate (from the tank), typical: 0.27–0.74 gpm (1–2.8 l/min)

Membrane rejection rate

1

, typical:  90%

Recovery rate (system efficiency

2

), typical:  15%

Drain water flow restrictor: 300 cc (ml/min) nominal, up to 360 cc in working mode, open 
flow in flush mode.

Auto-flush duration: 18±10% s

Tank Storage Capacity (Total Volume): up to 2.5G (4.0G)

1

  For all dissolved solids combined as measured by TDS or conductivity meter.

2

  Efficiency rating means the percentage of the influent water to the system that is available to the user as 

reverse osmosis treated water under operating conditions that approximate typical daily usage.

Содержание Prio Expert MO600

Страница 1: ...Prio Expert User s Guide MO600 Reverse Osmosis Filtration System with Pump Box Storage Tank Pump Box Unit with Auto Flush Main Filtration Unit Set ...

Страница 2: ...ovetheplugfromtheelectricaloutletandshutofftheinletvalveduringyour vacations or other extended periods of time when the appliance is not in use Unplug the pump unit from the electrical outlet while servicing the main filtration unit and changing the membrane or filters Do not use the appliance if operating requirements such as water tempera ture water pressure electrical supply etc are not met The...

Страница 3: ...he scale and debris build up on the membrane outer surface The booster pump increases pressure to radically improve the performance and effective ness of the R O unit in all three key areas increases filtered water flow production rate increases rejection rate improves water purification quality increases recovery rate de creases amount of waste water Prolongs the membrane and pre filter s service...

Страница 4: ...h the faucet and waste water is drained through the drain saddle Detailed connection scheme is shown on the following charts Usually both units the pump box and the R O unit with tank are placed under the sink such as in your kitchen and the filtered water faucet is mounted on the sink deck near your normal water tap After installation you will get clean water by simply opening the filtered water ...

Страница 5: ...nletwateroritspressureistoolow Thehighpressureswitch shuts off the pump when the filtered water faucet is turned off and water storage tank is full Pump The pump box unit is equipped with a low voltage booster pump powered by the included transformer for safe operation Inlet Valve An adapter ball valve is included to be installed into the cold water supply line to feed water to the pump box inlet ...

Страница 6: ... 10 5 gpg Iron 0 1 mg L Manganese 0 05 mg L Hydrogen Sulfide 0 00 mg L Maximum supply water TDS 1000 ppm Indoor use only Electrical input AC 100 240V 50 60 Hz Maximum length of the line between the pump unit and the membrane split installa tion 50 ft 15 m purchase of extra tubing may be required Tubing Performance Performance of the appliance such as filtered water delivery rate rejection rate etc...

Страница 7: ...Notes 1 Shut off the cold water supply under the sink or the location where the system will be installed If the existing valve is inoperable the water supply to the house must be shut off Then relieve the water pressure by opening the cold water tap Do not connect the system to hot water source 2 Depending on your plumbing system and sink countertop type you may need to use tools like variable spe...

Страница 8: ...t valve waste water outlet permeate outlet to the tank union tee fitting from waste water outlet of the membrane to drain or waste water collection container check valve filtered water faucet from inlet valve to R O unit inlet from filtered water outlet of the R O unit General connection scheme ...

Страница 9: ...o Connect the Tubing to a Fitting 1 Remove the lock if present not present in self locking fittings 2 Push Insert the tube firmly until full stop 3 Pull the collet back slightly 4 Replace the lock if present To Disconnect the Tubing 1 Remove the lock if present not present in self locking fittings 2 Push the collet and hold 3 Pull the tubing out 4 Replace the lock if present No skewed cut 1 4 3 2 ...

Страница 10: ...t for details 2 Create hole for the filtered water faucet and install it mount drain saddle here never mount here Tip If you have a soap dispenser or a water sprayer in an existing hole you may remove it and use its hole for the filtered water faucet 3 Install drain saddle 3 8 3 8 1 2 1 2 mount drain saddle here never mount here never mount here The square foam gasket with a circle cut out must be...

Страница 11: ...ng of the pump box unit Insert the supply tubing from the RO unit fitting of the pump box unit into the supply inlet of the R O filtration unit Connect with the tubing the tank outlet fitting of the R O filtration unit with the permeate fitting of the pump box unit through the T fitting on the way Then connect with the tubing the branch of the T fitting with the tank valve fitting Insert the waste...

Страница 12: ...r flow appears from the faucet the flow is weak and inconsistent wait for 2 3 minutes more and shut off the faucet wait for auto flush to complete 18 s 3 min 3 min 5 10 times repeat saddle here never mount here never mount here repeat the cycle open the filtered water faucet wait for 3 minutes shut off the filtered water faucet wait for auto flush to complete 5 10 times after you finished with pre...

Страница 13: ...cement of a component should be with one of identical specifications as defined by the manufacturer to assure the same efficiency and contaminant reduction performance To reduce the risk of water leakage or flooding and to ensure optimal R O system performance Change the disposable pre filters every 6 months or sooner if you observe a noticeable reduction in water production rate Change the dispos...

Страница 14: ...ts place foreasieraccess disconnectexternaltubes if necessary and open the unit s cover locate the filter membrane to be changed disconnect its inlet and outlet fittings and remove it take new filter membrane and install it in the place of the removed one observing the water flow direction arrow on its label and restoring the connections see the internal con nections chart for details 3 min 3 min ...

Страница 15: ...ernal tubes and place the unit back in its place After you finished changing filters or the membrane follow the initial washing procedure as described above With initial operation check for leaks If a leak is observed verify that the tube or branch pipe of the filter membrane housing is pushed into the quick fitting far enough to seal the tube against the O ring and that the tubing was cut at 90o ...

Страница 16: ...tinue the following steps If the tank feels light that means it is not time yet to recharge the tank at this moment Locate the air valve Use bicycle tire air pump to pump air into the tank through this valve Keep the faucet open while pumping air so that all water inside the tank can be purged After all water has been drained from the tank use an air pressure gauge to check the tank pressure The t...

Отзывы: